Winter 2002/2003 - This is my current project. I began shortly before Christmas 2002. It has taken much longer than I had planned. The re-assembly is taking much longer than I thought it would. I am adding an OD transmission and have made many repairs to the wire harness as well as rebuild the heater box. I had replaced the master cylinders last winter, so not much to worry about there.
Engine and transmission Coming Out
Engine Removed from Transmission
Cleaned and Painted
Empty Bay Looked even Worse
Stripped - Primer Coat Being Applied
First Coat of Paint
Reassembly Has Begun
Before
After