Jawed Ahsan

C-18, Block-1, Street 3, Chapal Sun City,Gulzar-e-Hijri, Karachi, Pakistan

                                                                               Cell #0092300-2336129

E-mail Address: [email protected]

 OBJECTIVE

A position in Quality Control and Testing Field

 SKILLS

Weld Inspection                                    Material Inspection                   Dimensional Inspection

Blue Print Reading                                Material Testing                         Document Control

Codes/Standards                                  Visual Inspection                       Electrodes Selection     

Preparation of BOQ.                             Cathodic Protection                   NDT

Tank Inspection                                    Piping Inspection                      WPS/PQR        

Pressure Vessel Inspection                   Heat Exchanger Inspection        Furnace Inspection

Material Selection                                 Witnessing of WQT                   Hardness Testing

Sand Blasting/Painting Inspection         Witnessing of Leak Testing        Thickness gauging

Vender Inspection                                 ISO-9000                                 Witnessing of PWHT

Integrity Management & RBI                   Condition Monitoring

 

PROFESSIONAL DEVELOPMENT COURSES

Basic Level Vibration Analysis             (SKF)                2008

Authorized Pressure Vessel Inspector  ( API-510)         2004.

( American Petroleum Institute)

Level - 2 in Radiographic Testing (PAEC)                                    1997.

Level - 2 in Radiographic Testing (Recertification)                        2003.

Level - 1 in Ultrasonic Testing                                                     2002.

CWB(Canadian Welding Bureau)   Welding Inspector                    2004

Attended a Course on ISO - 9000                                                1996                           

 

HIGHLIGHTS OF QUALIFICATIONS

 

1). Over 13 years experience in Quality Assurance/Control and testing within the Shut downs, Fabrication, Inspection, Installation & In-Service Inspection of Pressure Vessels, Heat Exchangers, Piping, Steel Structure etc.

2). Proficient in Non-destructive Testing relating to RT, UT, MT and PT

3). International experience with Clients i.e Babcock Wilcox Gama , Ansaldo, Marubeni, Mitsubishi etc.

4). Expertise in supplier quality control, source, receiving and first article inspection, quality contract audit, vendor evaluation.

5). ASME Section II,V,VIII,IX,API-650,API-653,API-1104, API-510,API-572,API-576 and ISO9001

6). Bsc. Mechanical Engineering Degree from NED University in 1993. 

7). Valid certification of API-510 ,RT Level II, UT Level 1, CWB Level 1

8)  Familiar with MS Office, AutoCAD 14 & Internet/ E mail.

 

SUMMARY OF  EXPERIENCE

1).  In-service Inspection of Pressure Equipment.

Inspection of  Pressure equipment as per API-510, performed basic pressure and thickness calculations  for Pressure Vessels, Recommended repair Welding Procedures for defects in various Carbon Steel and Stainless Steel. Performed DPT & MT. Performed UT thickness readings. Failure investigation and fitness assessment of  Pressure Vessels, Heat Exchangers, Tanks, Piping etc,  External and Internal Inspection of Pressure Equipment, Risk based Inspection,  Arranged Profile Radiography, UT Scanning, H Scanning of Furnace Tubes, Review of plant P&IDs/Drawings/inspection isometrics /integrity review documents, inspection planning, Inspection of on-going pressure vessels, Review & interpretation of inspection results, Evaluation of the long-term/short-term corrosion rates, assessment of remaining life & future inspection intervals, Recommendations to the owner/user, Inspection during repair of the heaters, review of welding procedures/parameters, non-destructive tests etc, Review of reports of advanced inspection techniques like IRIS, RFEC, Non Intrusive Corrosion Mapping, prepared inspection reports for columns, heat exchangers, heaters, tanks, pressure vessels, Familiar with activities related to flow line inspections, Inspection of flow lines, Familiar with the Well configuration, X-mas Tree Valves & piping related issues ,Familiar with activities related to calibration of pressure relief devices & calibration witnessing, General visual examinations & familiar with inspection techniques for the tanks

2)Inspection

(a). Performed material inspection, Quality contract audit and Vendor evaluation for steel Pipes, Plates, Tubes, Forgings etc. went to suppliers’ premises to control the products quality before order issuing or product shipping;

(b). Carried out receiving, shop floor and site inspection for  pressure vessel, piping and Steel Structure, related to visual quality, dimension, weld, assembly, material traceability, surface treatment, coating, packing and identifying.

3).  Supervision

(a). Supervised quality management system, procedure implementation and document filing at boiler pressure vessel plant, jobsite and supplier premise;

(b). Oversaw fabrication process at shop floor or jobsite from raw material cutting, machining, welding, assembly, testing and coating to delivery packing ensuring adherence to quality requirements;

(c). Conducted pre-inspection meeting to carry out quality requirements, specification and ITP;

(d). Monitored, counted and reported the project progress.

(e). Arranged inspection, testing and heat treatment works.

4).  Testing

(a). Witnessed pressure tests and mechanical performance tests for pressure vessel, Heat Exchanger;

(b). Operated non-destructive testing related to RT, UT, MT and PT.

5).  Reviewing

(a). Reviewed and approved inspection and testing procedures, reports, Welding Procedure Specification and Procedure Qualification Record;

(b). Modified and enhanced quality requirements on drawings, specifications and contract documents so as to meet relevant standards, regulations and customer requirements.

6).  Problem Solving

(a). Communicated with others to collect necessary information and tools;

(b). Found the way by self to fix the problems.

  

 

EMPLOYMENT HISTORY

1) Pak Arab Fertilizer                               Oct 2006 to Oct 2008

Section Head (Inspection)

2). Ranhill                                              Sept  2003 to Sept 2006

     Inspection Engineer

3). Nespak                                               July 2000-  August 2003

Engineer (QA/QC)

4).  Sefec Engineering ( Pvt.) Ltd.           April 1995- June 2000

Quality Control Engineer.

5).  M&J Engineering (Pvt.) Ltd.              Feb 1993-  March 1995

       Junior Engineer

 

PROJECTS

Worked on following Projects.

Dismentling of NH3 Plant in Netherlands:        Pak Arab Fertilizer

Adhi LPG/NGL Plant II   Client : PPL

Turn Around 2005 Engro Asahi Plant  Client : Engro Asahi

SHUT DOWN -2000 ICI PTA PLANT   CLIENT: ICI Pakistan

FABRICATION OF LPG VESSELS      CLIENT: National Refinery & SGS Ltd.

ENGRO ASAHI PVC PLANT. Client: Samsung (Korea) & Mitsubishi Corporation (Japan)

FABRICATION OF DOCK LIFT STRUCTURE:  LLoyd’s Registered of Shipping

HABIBULLAH COASTAL POWER PLANT. :Babcock Wilcox Gama(Turkey) & Fiat Avio (Italy)

LIBERTY POWER PLANT PROJECT. Client : Ansaldo (Italy) & Siemens.

QAISAR LUCKY PETROCHEMICAL PROJECT. Client : Qaisar Lucky

DG KHAN CEMENT, MAPLE LEAF CEMENT CLIENT:    F.L Smith (Denmark)

BINQASIM THERMAL POWER STATION : CLIENT :Marubeni Corporation (Japan)

1220 HUB POWER PROJECT     Client : Ansaldo

EDUCATION

Bsc ( Mechanical Engineering )  from NED  University of Engineering and Technology.

 

 

 