Resume

of
Joaquin Toral

Home
Resume
Photo Album
Links

   Table of Contents

 

EMPLOYMENT

MAJOR PROJECTS AND ACCOMPLISHMENTS

COMPUTER SKILLS

SEMINARS/ TRAININGS

OFFICIAL TRAVELS

CLUBS/ MEMBERSHIP

 

 

 

 

 

EMPLOYMENT

 
Principal Engineer C
Civil Engineering Design Department 
December 1992 - Present

Duties and Responsibilities

Prepares and checks design calculation bid/construction drawings, technical specifications and quantity estimates for a proposed project; 
Reviews/evaluates proposals ( i.e technical plans, drawings, specs., etc.) submitted by a Contractor/Consultant for an on-going project;
Conducts field inspection/coordination meeting at project and/or plant sites, RE design and remedial measures;
Prepares technical drawings RE remedial measures for an on-going project;
Prepares office memoranda and technical reports;
Assists in preparation of a complete scheduling of activities for a proposed project;
Reviews/evaluates technical documents/specifications submitted by Supplier/Manufacturer.
Performs other assigned tasks (i.e. meetings, intervening projects, final inspection/acceptance, etc.)

Engineer A
Thermal Power Design Division 
July 1990 - November 1992

Engineer A 
Hydro Power Design Division
January – June, 1990

 

 

 

   MAJOR PROJECTS AND ACCOMPLISHMENTS


Civil Engineering Design Department

230 kV Substation Project (On-going)

Preparation of tender documents i.e. site development, drainage system, structural design, technical specifications and quantity estimates

1,200 MW Natural Gas Power Plant Project

Review/checking of design and construction drawings submitted by the Contractor for the 500 kV substation

138 KV San Roque – San Manuel Transmission Line Project

Preparation of design criteria and technical specifications for the civil works portion
Site inspection along the proposed transmission line route

 138 KV Leyte-Samar Transmission Line Project

Review/checking of the design and erection drawings for the transmission line steel towers submitted by the supplier (work completed)
Preparation of the design and construction drawings, technical specifications and quantity estimates for the tower foundation
Site Inspection whenever a problem arises including periodical monitoring of construction progress 

 2 x 45 MW Barge-Mounted Power Plant Project

Preparation of the design and construction drawings, technical specifications and quantity estimates for the mooring facilities/marine structures
Site Inspection whenever a problem arises including periodical monitoring of construction progress

 2 x 60 MW Barge-Mounted Power Plant Project

Preparation of the design and construction drawings, technical specifications and quantity estimates for the mooring facilities/marine structures
Site Inspection whenever a problem arises including periodical monitoring of construction progress

 105 MW Barge-Mounted Power Plant Project

Preparation of the design and construction drawings, technical specifications and quantity estimates for the mooring facilities/marine structures
Site Inspection whenever a problem arises including periodical monitoring of construction progress

 300 MW Combined Cycle Power Plant Project

Review/checking of the design and construction drawings for the various structures submitted by the Contractor
Site Inspection whenever a problem arises including periodical monitoring of construction progress

 2 x 55 MW Geothermal Power Plant Project

Review/checking of the design and construction drawings for the various structures submitted by the Contractor
Site Inspection whenever a problem arises including periodical monitoring of construction progress


 



COMPUTER SKILLS

 
AutoCad 12, 13, 14, & 2000
PLS CADD 
STAAD III 
Web Page Development
MathCad 
Microsoft Word 
Netscape Communicator 
 
Microsoft Excel 
Microsoft Project 98 
Microsoft Powerpoint 
Microsoft Internet Explorer 
Microsoft Outlook Express
Microsoft Windows 3.11, 95, 98
Digital Camera/Camcorder

  
 









SEMINARS / TRAININGS


Page Development Course
Ateneo Information Technology Institute, May 11 - June 1, 2002

Seminar on Project Planning, Scheduling, Monitoring and Control 
National Power Corporation, Philippines, October 4-6, 2000

Seminar-Workshop on Construction Monitoring And Cost Control 
University of the Philippines, May 6-8, 1998

Seminar on EHV Power Transmission Line Project (Design, Project Management, Construction Supervision, and Test & Commissioning) 
NEWJEC Engineering Consultants, April 1-21, 1997

Seminar on Corrosion of Reinforced Concrete Structures 
University of the Philippines, June 25-28, 1996

Seminar on Gabions & Mattresses
University of the Philippines, February 9, 1996

Training on Autocad release 13 for Windows 
Microcircuits Corporation, November 20-24, 1995

Introduction to Construction Project Management 
Philippine Institute of Civil Engineers, March 3, 1995

Earthquake Hazard and Risk in the Philippines 
Association of Structural Engineers of the Philippines, October 18-19,1993

Practical Building Wiring Electrician 
Iriga City, May 21, 1984 


 





 

 

OFFICIAL TRAVEL

 

Witnessed the full-scale, destruction and material tests for two types of power transmission steel tower 
KEC International Ltd., Jaipur, India - December 12-25, 1998

Witnessed the full-scale, destruction and material tests for two types of power transmission tower and attended “Training on Overhead Power Transmission Lines”
ABB SAE SADELMI SpA, Milan, Italy, April 10-May 5, 1995


 

 

 

 

CLUB / MEMBERSHIP

 
Philippine Society of Civil Engineers
Geodetic Engineers of the Philippines


Home Resume Photo Album Links

This page has been created in June 2002 by Joaquin Toral <[email protected]>
This page is Copyright © 2002 by Joaquin Toral. All Rights Reserved
Revised: September 09, 2002 10:09 PM (+08:00)

Hosted by www.Geocities.ws

1