This site is best viewed with Mozilla Firefox. Click here to get it.



Renovations Update:

The Livonia Public Schools District is talking about tackling the auditoriums aged fly system next,
possibly giving us as many as 26-30 flyable riggings. Stay tuned, as more updates will be posted
as details become available.


Original Architects: Wakely Associates A/E (Formerly Wakely Kushner Inc.)

Contracting Firm: George W. Auch Company

Renovations Started: June, 2006

Renovations Completed: August, 2006


Overview of Work:

(Done) - 20% of stage floor replaced, entire floor painted black.
(Done) - Red stripe painted along entire width of apron to mark edge of stage.
(Done) - Slots in house walls for tracks plastered over, all walls painted black.
(Done) - Tracks in ceiling removed, holes patched with new sheetrock.
(Done) - Entire ceiling and proscenium walls repainted white.
(Done) - Sound baffle frames sanded and repainted.
(Done) - All house lights (aprons included) replaced with brighter, more energy efficient units.
(Done) - 5 Access panels installed in house ceiling to permit access above upper bowl.
(Done) - 12 channel snake permanently installed on stage right house and sound booth walls.
(Done) - Snake conduit in house painted to match brick wall.
(Done) - Spotlight intercoms "permenantly" installed.
(Done) - Orchestra pit subfloor resurfaced with 1/8" of plywood.
(Done) - Metal covers installed over orchestra pit step light junction boxes.
(Done) - Pit wall and wooden cap thereon repainted satin black.
(Done) - Stage mop board sections (formerly steel) replaced with thick, acoustics-damping rubber.
(Done) - Metal cover installed over junction box for missing clock in lecture hall B.
(Done) - Lecture hall screens removed and plastered over, keyswitch wiring removed.
(Done) - Auditorium ceiling repainted, sheetrock repaired in lecture hall B.
(Done) - Lecture hall wall tracks removed, alleys filled in to match grade.
(Done) - Half-house curtain track and pulley system removed.
(Done) - Ceiling vents cleaned and repainted.
(Done) - House, midget room, pump room and house closet doors sanded down and repainted.
(Done) - Plaster above house doors repaired and repainted.
(Done) - Spotlight towers replaced by district.
(Pending) - Sections of carpet in upper bowl replaced by district.
(Pending) - Molding replaced along base of orchestra pit and house walls.




Renovation Pictures Taken Thursday, August 03, 2006
You are free to use and distribute these pictures, I retain no copyrights, have fun.
Hosted by www.Geocities.ws

1