IconMatrix Consultancy
Services

Home

About Us | Services | Solutions | FAQs | Our Location | Contact Us | Site Map

Storage Tanks

Verification of parent and weld materials; welder qualifications; physical testing of welds by crack testing; examination of radiographs; witness of hydrostatic tests; and provision of reports.

 

 

Inspection

On site or off site inspection co-ordination; liaison with other inspection authorities; project co-ordination; sub-contract co-ordination; and drop in inspections

 

 

Engg General

Review of purchase order requirements; quantity inspection; value for money inspection; physical examination of packing; review of packing certification; dimensional control; suitability for transport examinations; container inspections; and shipment inspections.

 

 

Eqpt Inspection

The eqpt. shall be inspected to determine any deviations from OE specifications. Vibration analysis, indications and inspection of sub-assy will be performed. Hydraulic system, lube system and coolant system will be checked for fluids at all points and for integrity of all hosing and piping (as applicable). A written report will be provided regarding the mechanical condition of the machine.

 

 

Work Expediting

Direct and indirect expediting arranged with the same level of reporting. Visiting the inspection source as individual or under yours, but either way ensuring total professional representation.

 

 

Vendor Assessment

Vendor Assessment Service matching to ISO 9000 standards. Field Work including everything from a complete management service for your approved suppliers list to a one off single audit. Scope includes quality audit and capability audits.

 

 

Project Management

Planning, coordination, supervision, control and execution of Engineering Projects as per the master schedule. Minutes, report generation on daily, weekly and monthly basis. Milestone review about the project progress and feedback on the infrastructure and contracts status.

 

 

ISO 9000

Gap analysis, Roadmap to ISO, training on ISO, training on IQA, training MR, QMS documentation, internal auditing and management review, CAPA, implementation of ISO and guidance to preassessment as well as certification process.

Hosted by www.Geocities.ws

1