New Build Bath and shower tiling Project - Wellington
1. Forming the shower tray
3. Top off with Layer of Ditra membrane
2. Lay schluter membrane and pour thinset to grade the pan slope, fit cement boards
Tiled onto cement board throughout on walls & ceiling, covered with Ditra waterproofing sheet products throughout using Mapei ultra-lite thinset, with Ceramic tiles schluter tile edge trims and sanded Grout to finish.
Shower - The finished Product
Bath - the finished product
Hosted by www.Geocities.ws

1