PULUPANDAN PORT INFO.

There are 2 possible ways of loading of sugar:

1.Pulupandan gov't pier- (anchorage operation)

- loa 250m (can accomodate vsl with max loa 180m)
- draft 8.5m (max 9.0)
- loading rate: 4,000mt/day by conveyor (with trimming machine)
- stev. working shift: 0600h-1200h,1200h-1800h,1800h-2400h & 0000h-0600h
- pilot charges 100% overtime if vsl dock/undock during nightime/Sundays/Holidays
- plus frt tax 4.5% x ttl frt amount
- other possible supplier/shipper: all asian sugar milling amerop sugar milling southwind
    sugar milling


2. Visayan trading corp (private pier)

- loa 250m / draft 8.5m (max 9.0)
- loading rate: 4,000mt/day by conveyor ( with trimming machine)
- plus frt tax 4.5% x  ttl frt amt
- dock/undock depends on current
- pilot charges 100% overtime if dock/undock during nightime/Sunday/Holidays


ESTD PORT D/A BASIS 7 DAYS PORT STAY:

Port Dues: $0.081 x 15,042GRT = $1,218
Berthing Fee: $0.040 x 15,042GRT  X 7 days = $4,212
Pilotage: $247 x 4 moves = $988
Tuggage: abt $1,500
Customs & Formalities: abt $2,000
Lumpsum Agency Fee: $1,600
-------------------------------------------------------
TTL ESTD PORT D/A = $11,518 (BSS $1=55)
Hosted by www.Geocities.ws

1