* La Union Port Information *

1. Poro Point Gov't Pier : LOA 150m / draft 8.5m near end, 17m far end.
    controlling draft 9.3m
  2 berths, East side & West side. Usable LOA is 120m

2. Bacnotan Union Cement Pier : finer pier LOA 200m / draft 4m - 15m far end.
   20,000 DWT can safely berth
   loacated beside Government pier
   equipment : 6 x 5T clambshell, 4 x 5T bucket, forklift, bobcat

- disch urea in bulk : 1st few shift 2,500-3,000mt/day
     centering 2,000-2,500mt/day
     receriver : Fertifil, Phil Planters, Farmix, Fercom Marketing
                 Norskhydro, Swire Agri, Sailtech

- disch coal : Gov't Pier - 1,200mt/day w/4gangs direct to truck
              Bacnotan Pier - 2,000mt/day w/4gangs to conveyor
      receiver : Bacnotan Union Cement, PNOC, Northern Cement

3. Sual NPC Pier : LOA 240m / Draft 13.3m, newly built ('00)
    coal disch 12,000mt/day by bucket type unloader
    7-8 panmax vsl calling per month

** UNION CEMENT BACNOTAN PLANT (PHINMA GROUP)
++ Contacts : Julius B. Yballe / Vice President
      Phone : (072) 8885673 Fax : (072) 8885671
      Email : [email protected]
Capacity
Clinker -- 1.0 million metric tons per year
Cement - 1.1 million MTPY
Packing - 4,800 bags (40 kgs each) per hour

The Union Cement - La Union Plant has four kilns, including a pre-calciner kiln with a rated capacity of 2,400 metric tons per day. The packing facilities include two rotary packers, each with a capacity of 2,400 forty-kilogram bags per hour. About an hour away, in Poro Point, is another seaport of Union Cement Corporation. This has a total length of 200 meters and draft of 20 meters.

ESTD PORT D/A BASIS 5 DAYS PORT STAY:

Port Dues: $0.081 x 12,745GRT = $1,032
Berthing Fee: $0.039 x 12,745GRT X 5 days= $2,485
Pilotage: $181.67 x 4 moves = $727
Tuggage: $1,200
Mooring/Unmooring= $38
Customs/other autho. =$700
Lumpsum Agency Fee: =$1,800
--------------------------------------------------

TTL ESTD PORT D/A $7,982 (BASIS $1= P53)
POROPOINT