| * Iligan Port Information * 1. Government Pier : LOA 140m / draft 8-9m disch onto pier apron is allowed disch cement clinker 400-500mt/gang/day loading Chrome Ore Slugs 400mt/gang/day by bucket shipper : Intergrated Chrome Corp (INCHROME) 2. Philmico Foods Pier : LOA 220m / draft 11.5m (jetty tipe w 2 dolphin) no nighttime docking / undocking anytime depend on weather/current disch wheat 5,000-6,000mt/day by 2 suctions direct to silo pilotage : 4 moves + launches (p45,000)+hazardous(1 tug, p100,000) line handling : p15,000 3. Iligan Cement Pier : LOA 120m / draft 8.5-9.5m vessel has to dock portside alongside disch cement 500mt/gang/day direct to truck by clambshell disch onto barge is very seldom but ICC have sufficient barges chrome ore slugs loading rate abt 1,800mt/day/4 gangs by ship's gear using bucket copra pellet loading rate abt 4,000mt/day by one conveyor 4. Mindanao Portland Cement : facility : 8" dia.pipeline, 24 roller conveyor cargo handled : bulk cement, other gen.cargo, clinker, gypsum, silica quartz 5. Alsons Cement : receive at anchorage w/max.1,000mt/gang/day depend on vessel's gear and clambshell. They don't have clambshell 6. San Miguel Pier : LOA / draft 12m loading Copra Pellet abt 4,000mt/day by one conveyor cargo handle : bulk crude coconut oil, processed coconut, solvent extraction, pellets, copra expeller/cake/meal 7. Grand Export (Granex) Pier : LOA 200m / draft 14m loading rate 500mt/hr loading Copra Pellet abt 4,000mt/day by one conveyor (150-180mt/hr) cargo handle : crude coco oil, copra pellets no night dock/undock 2 shifts/day stev works 24 hrs 7 days a week PORT DA (9/19/08) berthing fee : $0.02 x grt x cal.days mooring/unmooring : p9,000 pilotage : 2 moves + launch assist (p14,000/move) + hazardous (1 tug, p4,000/move) tugboat : p18,750 x 1 tug x 2 moves customs boarding officer : p5,500 customs entrance/clearance : p4,500 customs inspector : p3,000/day + p6,000 (lumpsum) immigration (iligan) : p4,000 + P5,000/day(iligan) + p30,000 (manila) medical doctor : p4,500 other q'tine : p3,000 each ppa/pcg/bocpolice/harbormaster : p3,000 8. Findlay Millers Timber (FMICO) 9. Filipinas Shell Petroleum pier 10. Phil National Coal Corp 11. Caltex pier 12. Jimenez Oil Mills 13. Petron 14. GLOBAL STEEL PHILS.(SPV-AMC),INC. : East finger pier : LOA 185m / draft 7.5m near & 11.5m far-end West finger pier : LOA 185m / draft 8m Marginal pier : LOA 200m / draft 8m near & 12m far-end no nighttime docking/undocking deep draft vsl records : 1) mv yong an 1 (40,678.64mt slab, 2/03/08) f/10.54m, a/11.02m 2) mv efi theo (39,256.58mt slab, 3/16/08) f/10.18m, a/10.64m 3) mv mare doro (40,004mt slab, 8/26/08) f/10.7m, a/11.73m 4) mv sea banian (39,410.64mt slab, 5/16/08) f/10.43m, a/10.78m deep draft vsl docking vs haniship inquiry (3/12/09) of vsl f/10.0m, a/12.0m to : haniship,inc. the following are our comments : the vsl may be allowed to Dock provided : a) it shall approach the PIER while the tide on rise b) vsl shall be allowed to have gradual discharge while it is 5 meters distance from pier rubber fenders c) the vsl shall be unloadeded at its forward hatches while its aft still about 30 meters towards seaside regards, fulkant jha head(PPIC & Logistics) +63 63 492 2609 PORT DA (actual on 10/17/08) berthing fee : $0.04 x grt x cal.days mooring/unmooring : p7,500 pilotage : launch assist (p14,000/move) + hazardous 1 tug (p3,000/move) towage : P12,500 x 1 tug x 2 moves (seaborne lighterage & stev corp.) customs boarding officer : p6,000 customs entrance/clearance : p4,500 customs inspector : p3,000/day + p6,000(lumpsum) medical q'tine : p4,500 other q'tine : p3,000 each immigration (iligan) : p1,700/day(overtime) + p1,300/day(others) other formalities stevedorage : shorecrane hirage : 15. TREASURE STEEL PIER (under construction asf 2008) pier owner : treasure steel works corp. p/s : lat 8 deg 20n, long 124 deg 15e disch at anchorage disch rate (met coke) : 2,500mt-3,000mt w/4 gangs available 1 barge (4,500 dwt) 16. HOLCIM PIER (owner : holcim phils) LOA : 200m / Beam 34m / Draft 12.5m no nighttime docking / undocking anytime depend on weather/current disch rate (met coke) : 3,000mt-5,000mt w/4 gangs disch by clambshell to truck or bucket 17. SMC Private Pier Draft 12m loading rate 350mt/hr docking/undocking anytime 24 hrs loading is subject to 4.5% FRT/carriers tax |