| * Cebu Port Information * 1. Cebu International Pier 5 berths with LOA 440m, Draft 8.5m berth 1 : for bulk/breakbulk/gen cargo vessel berth 2 & 3 : for container vessel berth 4 & 5 : for domestic passenger vessel controlling draft : 8.5m 2. Atlas Consolidated Mining & Dev't Corp. Pier (Sangi, Cebu) LOA 115m / draft 10m (one berth only) two moorings 30m away from pier end owner : Atlas Fertilizer Corp. 3. Toledo Power Corp. (Toledo, Cebu) : LOA 160m (90m mooring dolphin) / Draft 12m docking/undocking anytime P/S : lat 10 deg 23N, long 123 deg 37 E 4. Danao (Sta.Fe) pier : 33km from Cebu City grab capacity 2mt and 3mt receiver : Lloyds Richfield 5. San Fernando pier : LOA 80m / draft 5m abt 40km from Cebu City 6. General Milling pier : suction unloader w/4,000mt/day LOA 270m/ Draft 28m No nightime dock/undock 7. Apo Cement Pier (Cebu City) : LOA 70m / Draft 7m 8. Lodo Wharf : jetty type pier LOA 200m / draft 8.2m 9. Alcoy Port : owner: DOLOMITE MINING CORP. SUBCONTRACTOR: PHILIPPINE MINING SERVICE CORP. LOA 180m/Draft 13m 10. Balamban Pier (Tsuneishi Wcip Balamban Pier) receiver : Tsuneishi heavy industries (cebu) inc. P/S : lat 10 deg 1.42N, long 123 deg 53.5E LOA 130m w/2 berths / Draft 8.0m no beam/air-draft restrictions no nighttime docking/undocking pilot & tugboat compulsory |
![]() |
| Cebu International Pier |
![]() |
| SANGI (atlas) PIER |
![]() |