| Project 3 - Case study and Strawberry Creek | ||||||||||
![]() |
||||||||||
| Sydney Opera House Drawings required: plans for all levels at least two cross-sections at least two exterior elevations one exterior or interior perspective or axonometric drawing 3-D required: model cancelled!!!... thank God, can't imagine having to actually built the thing! Due date: October 30, noon |
||||||||||
![]() |
||||||||||
| Strawberry Creek near the Faculty Glade Drawings required: plan (1/4 scale) site plan (1:20 engi scale) two 1/2" cross sections 1/4" longitudinal section 3-D required: model (1/4 scale) Due date: extended to November 6.... story! |
||||||||||
| next 11B project... | ||||||||||
| back to home | ||||||||||