PROJECT RECORD - TELKOM PROJECT |
- Engineering, Installation, and Test Commissioning :
- 900E1 Project Extension at 6 Sites DIVRE-2 Jakarta
- Rungkut V5.2
- STP National SDL Extension at 4 Sites
- Trunk Toll at 2 Sites
- Intelligent Network Partnership at 7 sites, 2001
- Investigation, Re-Engineering and Installation of Grounding Systems at 9 Large Central Offices in Divre-2 Jakarta and 1 Central Office in Divre-1 Pakanbaru,
2004
- High Power Amplifier Transmission Spare Part for Telkom – MSC at Cibinong,
2004 .
- Repair Tools for Radio Base Station at Telkom-MSC Jakarta,
2004
- Advance Operation and Maintenance Training for Lucent SDH Product Wavestar ADM16, TDM10G, for PT. Telkom at Central Ancol Jakarta,
2005
- Repair Maintenance Contract for 3-years Nationwide for 5ESS modules,
2005
- Investigation, Re-Engineering and Installation of Surge Arrester for 36,000 Customer Line at 4 Central Offices in Divre-2 Jakarta,
2005
- Investigation, Re-Engineering and Installation of Grounding Systems at
sites STO Cikampek, Divre-2 Jakarta. Grounding grounding
protection for equipment NEC Central Office (Neax), various DC Power
plant, Various Transmission system, MDF and Mitra's BTSs.
Existing Integrated Grounding System
is to be re-engineered become Isolated
Grounding System. Sept 2005
- Investigation, Re-Engineering and Installation of Grounding Systems at
sites STO Purwakarta, Divre-2 Jakarta. Grounding grounding
protection for equipment NEC Central Office (Neax), various DC Power
plant, Various Transmission system, MDF and Mitra's BTSs.
Existing Integrated Grounding System is to be
re-engineered become Isolated Grounding
System. Des-2005
|
|
|
 |