<BGSOUND SRC="http://www.geocities.com/gnhotrod2003/AnotherOneBitestheDust.mid" LOOP=INFINITE>
Underground Work at
When something burns up, we are ready to repair it.
Kyle Beck and Richard Standridge inspecting the ditch for the underground Primary.  Kyle and Richard are now  working for Choctaw Elec.
Justin Wade and Josh Cheney getting material ready for the underground dip pole.  Justin KEC and Josh OG&E
Kyle Beck opening the hole to the switch gear.  He's not use to the underground work.  Most of the time he's 100 feet in the air.  Kyle is now working for Choctaw Electric Coop
Dallas Collins is operating the Backhoe for the underground.  Dallas is works for AEP/PSO in Okmulgee
We even make the Transmission Guys learn how to do underground, Kyle Beck works for CEC
Helping get the riser up the pole.
Steve Selvidge installing the underground riser on the dip pole.  The students share the work on the poles to learn all they can.  Steve works for Davis Elliot Construction Co. contracting for AEP/PSO in Tulsa, OK
Everyone in class has to do a primary Termination.  Open front and Closed front Transformers.  Three Phase and Single Phase also.  It's a Dirty Job, but someone has to do it.
Kyle Birkenfeld and Matt Spalding getting the dip pole ready for the underground wire.  Matt is with KAMO and Kyle is at GRDA
Next Page
Hosted by www.Geocities.ws

1