| Water Sewerage and Treatment | ||||||
| While each locator building shall be required to have its own septic tank system where sludge will be collected, the effluent from such septic tank systems will be discharged into a central secondary (final) treatment facility, which shall be provided at the Park. | ||||||
| Back to Infrastructure | ||||||