LIST OF TABLES
Page
Table 2-1 X-Ray Analysis Results of UC-W System 2-8
Table 2-2 Distribution of Sr in Fission Product Trap of the Third Test Capsule Containing Molybdenum Baffles Coated with Plasma Sprayed Al2O3 2-12
Table 2-3 Impurity Content of WF6 Samples Measured by Infrared Absorption 2-32
Table 2-4 Effect of Additives on the 2 Hour, 1973°K Stability of Al2O3 Grains 2-40
Table 2-5 Impurity Content of K-3 Trilayer Starting Materials 2-63
Table 2-6 Microhardness Measurements K-3 Unirradiated Controls 2-64
Table 2-7 Essential Components and Operating History for 6F2 2-96
Table 3-1 Emitter Temperature and Deformation 3-6
Table 3-2 Emitter Maximum Stresses 3-8
Table 3-3 Effects of Thermal Cycles 3-16
Table 3-4 Effects of Emitter Parameters on Distortion 3-18
Table 3-5 Cell and TFE Fabrication Summary 3-22
Table 3-6 Cell and TFE Fabrication Summary 3-23
Table 3-7 Cell and TFE Fabrication Summary 3-24
Table 3-8 Summary of GGA Thermionic In-Pile Life Tests 3-34
Table 3-9 Prototype TFE Test Summary 3-36
Table 3-10 In-Core Tests (10/16/73-1/22/73) 3-37
Table 3-11 Devices Listed in Initial Thermionic Performance Comparison 3-44
Table 4-1 Reactor and TFE Materials 4-11
Table 4-2 TFE Dimensions 4-12
Table 4-3 Neutron Energy Group Structure 4-14
Table 4-4 Reference Design Compositions 4-15
Table 4-5 Effect of Parametric Variations of Reactivity or Critical Size 4-20
Table 4-6 Nuclear Characteristics of Electric Propulsion Fast Reactor 4-22
xvii
Table 4-7 Principal Results - Trex Driver Fuel Studies 4-37
Table 4-8 Doppler Coefficients for Case 7 4-38
Table 5-1 Undersea Reactor Design Specifications 5-12
Table 5-2 Underwater Reactor Dose Summary 5-13
Table A-l Device, Design, and Processing Parameters A-3
Table A-2 Device, Design, and Processing Parameters A-5
Table A-3 Device, Design, and Processing Parameters A-7
Table A-4 In-Pile and Out-of-Pile Operational History Table A- 9
Table A-5 In-Pile and Out-of-Pile Operational History Table A-11
Table B-l Quality Program Plan Implementation Schedule for TFE Qualification Testing (5,000 Hours) B-4
xviii