MFA-241 Landing
section
Initial Model:
The
construction of the initial model was based on information of petrofisicos characteristics of Gamma-ray and Resistivity responses for the structural geology of the
interest area. The petrofisica information of the
well MFA-BAR was loaded in SS3D and a pseudo-log was generated. Using the data
collected during the drilling for this section, allowed us elaborate the
structural model of the area until the landing point. It is important to understand
that the surfaces used to define the top
and the base of J1 where modified from the original surfaces provided by PDVSA,
that define the regional structure in this initial model, this was done in a
hope of reducing the natural uncertainty of the surfaces. Due to this I am
expected during navigation the contribution of the information of LWD for the
refinement and fits of the model. Program SS3D can additionally use seismic
surfaces that allows for better resolution of the initial geologic model.
Modelo Inicial:
La construcción del modelo inicial del pozo MFA-241
se baso en la información de las características petrofisicas de las respuestas
del gama y resistividad de la estructura geológica de
interes. La información petrofisica del pozo MFA-BAR fue cargada en el SS3D y
se genero un pseudo-registro. Usando los datos obtenidos durante la perforación
de esta sección se elaboro un modelo estructural del área hasta el punto de
aterrizaje. Es importante entender que las superficies usadas definieron el
tope y la base de J1, donde fueron modificadas las superficies originales
provistas por PDVSA, las cuales definen la estructura regional en este modelo
inicial, esto fue hecho con la esperanza de reducir la incertidumbre natural de
las superficies. Debido a esto, estimo que durante la navegación e información
obtenida del LDW se contribuya al refinamiento y arreglo del modelo. El programa SS3D
puede utilizar además superficies sísmicas que permite una mejor resolución del
modelo geológico inicial.
Second Translation
Modeling
Landing during the perforation:
The
findings of the pre-well model gave the target sand the Arena to be 15ft deeper
than prognosis. The Geologist was advised and it was decided that landing would
be drilled to proposal and that if the sand came in deep, then the well would
be extended to take this into consideration in setting the casing shoe in the
Target sand.
We had good correlation as we
drilled the section with only minor corrections required for the model to match
up with the MFA-242 offset well and as already mentioned this continued the
theory that the Arena sand would becoming in around 15ft deep than proposal.
Spoke with he geologist of continuing with the tangent section for long before
starting the build section or to reduce the required build rate so that we
could still hit the sand in the correct position. It was again decided that we
drill to the proposal and if the sand unit came in later that the section would
be extended until we reached the sand to set casing.
The good correlation was see
as the drilling continued, not until around
The geologist adjusted the
top of the Arena sand unit to
Modelando Landing durante la perforación:
Los resultados del
modelo del Pre- pozo dieron en el objetivo de la arena
Se obtuvo una buena correlación mientras se estaba perforando esta sección
con correcciones solo mínimas, requeridas para comparar el modelo con el pozo MFA- 242 offset
y como ya mencionamos se continuo con la teoría de que la arena se
encontraba
Mientras que la perforación continuaba se observo una buena correlación,
no fue hasta alrededor de
La siguiente
arena permitió dar un tope provisional para la unidad de la arena de
El geólogo
ajustó el tope de la unidad de la arena
a 3098' TVD pero continuó perforando hasta el geólogo llamo a TD a @