FMJ & G RAILROAD
PROGRESS IN 2000

This summer we again began moving dirt. This time it was to build a garden railroad on the hillside.  This picture shows where ten feet of trestle and two bridges will eventually be built.
This is my son Michael.  He is my excavating contractor and #1 assistant.  Here he is installing ties on rails that have been bent.
Ed is our consulting engineer.  We met him and his wife, Ann, at a PGRS meeting.  He has helped us along the way with laying track and giving advice.
Ann is the treasurer
of the PGRS club.
Hosted by www.Geocities.ws

1