02-08-00 Day shift FAIRBANKS GOLD MINING, INC. CONTROL ROOM REPORT Time: 08:00:01 10:00:00 12:00:01 14:00:00 16:00:00 18:00:00 SAG MILL New feed: 1815 1668 1654 1788 1331 2112 Recycle: 431 261 244 224 154 215 Sag speed: 102 102 102 102 102 102 SAG HP: 11843 12211 12349 11520 12519 11525 SAG psi: 760 738 738 732 735 730 SAG Noise: 4 62 82 96 97 118 BALL MILL - N/S BM HP: 6881/6800 7062/6899 7157/6921 6916/6680 7105/6933 7343/7231 Cyclone GPM: 15652 13669 13178 13253 13940 12430 Cyclone psi: 17/17 16/15 15/15 20/18 16/16 12/12 Cyclone %sol: 54/58 53/58 52/57 54/59 50/55 43/50 PSM %-100: 0/-0 0/-0 0/-0 0/-0 0/-0 0/-0 PSM density: -0/-0 -0/-0 -0/-0 -0/-0 -0/-0 -0/-0 THICKENER Rake torque: 45 43 33 41 34 21 Rake level: -0 -0 -0 -0 -0 -0 Slime level: 10.4 10.0 10.2 10.0 11.0 11.4 Floc gpm: 46.1 33.8 32.7 38.0 34.3 34.0 U/F %solids: 52.8 54.9 54.5 52.7 55.3 56.1 Underflow gpm: 10058 8423 8280 8820 8282 4392 U/F massflow: 1954 1733 1687 1713 1724 935 UTILITIES Fresh water: 96 93 93 93 93 93 Process water: 89 90 97 97 92 91 Potable water: 68 65 64 61 59 58 Leach air psi: 32 32 32 32 32 31 Barge pumps: 4 2 3 2 2 3 RECYCLE CRUSHER Crusher amps: 20 42 44 36 28 33 Feed oil temp: 103 94 104 102 104 104 Rtrn oil temp: 105 100 106 104 104 105 Dust seal gpm: 9.6 9.7 10.1 9.6 9.5 8.7 Diverter: 0 100 100 100 100 100 Mill downtime, day: 41 SAG downtime, day: 40 Mill throughput, day: 19480 BM 1 downtime, day: 0 Crusher downtime, day: 218 BM 2 downtime, day: 0 Crusher throughput, day: 1899 Gravity downtime, day: 0