UPDATE PAGE......ENGINE NEARING COMPLETION......
Well, the block has been fully machined and balanced. A 2.2 pan was used due to the removal of the balance shafts. Here you can see the JE Pistons...and some of the well done machine work. Sorry the picts are low quality, but hey, this is  geocities!!!!
The head has been reconditioned, and looks like a new casting!!! The block was painted chrysler red, and the distrubitor was done aluminum. Will be using a red wells dist. cap, as well as red magnacore wires. The intake is ported, and was powdercoated chrome (or near chrome in this case) Still looks good
Installed the Turbonation turbo line  kit.  Good quality, and the price is right!! The waterneck was cleaned and painted to match  the distrubitor. More to come very soon!!!!
TThe turbo is a rebuilt Garette unit. It is larger than the stock Mitsubishi unit that used to occupy this space..... Those turbo lines just fit!!
Well the engine is in, and it is running well. Just about finished with the 1000 mile break in, and two oil changes later, I am ready for synthetic Mobil One.

   I do not have a picture of the engine in the car becaus I still need to rute vacuum lines, and I have a new computer calibration that needs to go in, as well as a new fuel rail,  injectors, and a 3 bar MA-P sensor! Them I will raise the boost to 18 PSI......then....(insert evil grin here!!!)
CLICK HERE FOR MORE!!!!!!
Hosted by www.Geocities.ws

1