Muhammad F. Hameed

27-D, Shah Rukn-e-Alam                                                                                                                                                                                                                (345) 421-7779                                             Colony, Multan, Pakistan                                                                                                                                                                                                               [email protected]


FIELD ENGINEER: Petrochemical/Power Plant Projects

PROFILE:        Invaluable professional experience covering the design review as well as inspection of relevant mechanical erection activities, according to approved drawings

                               and international standards, in multi-hundred million dollar Power Plant Projects

§     Proficient in all the relevant codes, practices and standards; for example, API 650 for oil tanks with the techniques like RT, DPT and Sand Blasting

§     Well versed with all the design drawings: PIDs, Isometric, Equipment, Piping, Steel Structure and Layouts

§     Strong technical background with the added benefit of thermal power plants design experience

§     Excellent coordination, time management and interpersonal skills in a multi-national environment

§     Proven abilities to finish the assigned tasks in time with dedication and commitment, irrespective of tough conditions

 

EXPERIENCE: NESPAK, Pakistan                                                                                                                                                                                                                                                                              04/10-Current

Worked through a series of positions, most recent first:

Junior Engineer, 425 MW CCGT Nandipur Project                                                                                                                                                                                                              04/10-04/11

Project Overview:

Duration:            30 months

Cost:                       329 Million USD

Client:                   PEPCO

Contractor:        Dongfang Electric Corporation (DEC)

Tasks performed:

§      Supervised DEC (China) for the erection of the project

§      Assured the implementation of approved drawings and quality procedure for all the erection activities

§      Ensured the implementation of international standards like ASTM, ASME (B 31.1), API (650), AWS, ASME Pressure Vessel Code (Sec II, V, IX etc) for different units

        of the project e.g. Gas Turbine, Steam Turbine, G.T and S.T Hall Steel Structure, HRSG, Fuel Oil Tanks, CW Pipeline and Mechanical Draft Cooling Tower

§      Inspected material fabrication, processes involved in erection activities like welding (SMAW, GTAW, SAW, pre-heat, post heat treatment, review of WPS, PQR, etc)

        grinding, Sand blasting and the techniques like RT, PI Testing, DPT for ensuring the quality of these processes

§      For the GT relating issues, worked in collaboration with G.E. Technical Assistants

§      Checked invoices and monthly statements of the Mechanical Erection Works as well as the equipment coming from Shanghai, France, Italy, Bulgaria etc to the

        site through Karachi Port

§       Examined the quantity, quality as well as the condition of the shipments arrived at the site and their storage at the ware houses

§       Ensured the implementation of Safety Rules during all the processes, erection works and crane operations

 

Design Engineer, 747 MW CCGT Guddu Project                                                                                                                                                                                                                   05/11-04/12

Project Overview:

            Duration:            36 months

Cost:                      602 Million USD

Client:                   PEPCO

Contractor:        Harbin Electric International (HEI)

Tasks performed:

§     Engaged in the preliminary and detailed design reviews of 747 MW Guddu Project involving all the systems like fuel oil supply, fuel gas supply, condensate, feedwater,

       HP LP and IP steam, HP bypass steam/de-superheating water, startup steam, hot water boiler, performance heater water supply, drain flash and blow-down, ST and

       GT lube oil, generator sealing, fire fighting, closed and open cycle cooling water, compressed air, GT washing water, GT evaporative cooler, and all the piping

        relating to these equipments covering from material approval, corrosion protection, painting and thermal insulations to dimensions focusing the corresponding

        international standards

§      Effectively reviewed all the piping interfaces and connections between G.E, B&V and the main contract HEI

§      Highlighted a major issue regarding the overall heat balance of the system occurred due to the low inlet fuel gas pressure of 21 Bar compared with the previously

       assured pressure of 35 Bar by the Gas supplier

§      Participated in the design review meetings with HEI (China)

 

Junior Engineer, 747 MW CCGT Guddu Project                                                                                                                                                                                                                05/12-Current

Tasks performed:

(Same job responsibilities as mentioned earlier, for 425 MW Nandipur Project)

 

Prior Experience:

 

NFC Institute of Engineering and Technology Training, Multan               

Lab Engineer                                                                                                                                                                                                                                                                                         09/09-03/10  

§       Taught and designed the lab manuals of AutoCAD 2010

§      Developed lesson plans and delivered lectures for Engineering Drawing and Mechanics of Materials

§      For B-tech students in Technology Training Centre, delivered lectures and brought hands on experience for couplings, bearings, gears etc

 

Honda Atlas Cars (Pakistan) Ltd.                                                                                                               

Internee Mechanical Engineer                                                                                                                                                                                                                                                                 07/07

§       Examined the assembling of steel sheets into body frame using spot welding

§      Coordinated in Assembly Line for the installation of bumper, interior, suspension, engine and Sensors (ECU)

§      Assisted in quality control during the final inspection of systems like Braking (ABS), Steering, Vibration and Noise detection and Wheel Alignment

 

EDUCATION:   Bachelor of Science Degree: MECHANICAL ENGINEERING

University of Engineering and Technology, Lahore, Pakistan

 

PERSONAL:      PEC Registration Number: Mech-22403