present(excluding 9)
A.12 B. 20. C.18 D.21 Ans C
7.
8. Avinash takes 15 days to complete a work and Bada takes 12 days to
complete the same work. If they work in alternate days, In how many days
they finish the work.
A. 13 days B. 13 1/4 days C. 6 1/4 days D. None Ans:
9. There is a circular track of length 400 mts. If A and B Starts at
the same point but in opposite direction with a speeds of 8 m/sec and 12
m/s respectively.Then at what time after the begining they will meet
for the second time.
A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: C
10. In the above question when will they meet for the first time at the
starting point.
A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: A
11. If the vertices of the triangle are A(1,2), B(-2,-3) and C(2,3)
then which is the largest angle?
A. Angle(ABC) B.Angle(BAC) C.Angle(ACB) D.None Ans:B
12. If (-1,0), (0,-1) and (-1,-1) are three vertices of a square then
what is the 4th vertex.
13. If [x] indicates integral of x i.e is the largest integer less than
x and |x| indicates absolute value of x then find the value of
[1.99]+[-2.99]+[1.03]+[2.50]
A. 2 B.1 C.-2 D. -5
Ans: A
(14-15). Watch the below Algorithm for 4 digit number X.
Step1: Add all the numbers
Step2: If it is less than 10 STOP, else go to Step1.
14. If X=6724 then what is the end result after applying the above
algorithm.
A. 19 B.10 C.1 D. None
Ans:C
15. If the 4 numbers are arranged in all possible orders then how
many solutions are possible.
A. ONE B. TWO 3.THREE 4. NONE Ans A
|
|