| Construction of Easy Go
Jay Benford Designed Badger Dory Schooner |
||||||||||
| Below shows the framing for anchor chain locker. |
![]() |
|||||||||
|
||||||||||
|
||||||||||
| The photo below shows the opening to the aft cabin, the footwell and the framing for the lockers. | ||||||||||
|
||||||||||
|
The photos on this side show tipping the epoxy to remove the bubbles.
Back to Start | Page Seventeen | Voyages |
||||||||||