| Washtenaw County Baha'i Center Construction Page |
| Architect The Kubala Washatko Architects, Inc. W61 N617 Mequon Ave. Ceaderburg, Wi 53012 |
| Construction Phoenix Contractors, Inc 121 Pearl St. Ypsilanti, Mi 48197 |
| Construction Phase Descriptions and Schedule |
| Site Clearing, Rough Grading, Excavating, Trenching, Foundation Drainage, Cast-in-Place Concrete foundations, Precast Concrete Plank, Structural Steel, Metal Fabrications - Structure related, Sheet Membrane Water Proofing, Bituminous Damp Proofing, Division 15 Mechanical Design, Division 16, Electrical Design |
| Phase I |
| Aggregate Base Course, Cast-in-pace Concrete - Floor Slabs, Mortar, Unite Masonry Systems, Single Wythe Masonry System, Cust Stone, Metal Fabrications, Rough Carpentry, Wood Trusses, Finish Carpentry, Vapor and Air Barriers, Board Insulation, Batt and Blanket Insulation, Blown Insulation, Fire Stopping, Asphalt Shingles, Wood Shingle Siding, Elasomeric Sheet Roofing - Fully Adhered, Sheet Metal Flashing & Trim, Joint Sealers, Standard Steel Frames, Flush Wood Doors, Stile and Rail Wood Doors, Entry Doors, Access Doors, Vinyl Clad Wood Casement and Awning Windows, Metal Framed Skylites, Finish Hardware, Glazing, Metal Stud Framing Systems, Gypsum Board Systems, Floor Tile, Suspended Acoustical Ceilings and Panels, Resilient Flooring, Carpet Glue Down, Painting, Metal Toilet Compartments, Plastic signs, Fire Extinguishers, Toilet Accessories, Division 15 Design Build Mechanical, Design Build Fire Protection, Design Build Electrical |
| Phase II |
| PHASE II work is to complete the structure without basement walls, drywall , insulation finishes, center stairs, doors and hardware, mechanical work, electrical work, and elevating lifting device. Basement fire protection, furnace equipment, temporary lighting and under floor plumbing lines will be included in PHASE II work. The center stair area will be concealed by a temporary wall around the floor opening. The trellis system and related walkway is not included. The curb and gutters asphalt paving, sidewalks (except main entry), and landscaping are all part of PHASE III. |
| Asphaltic Concrete Paving, Portland Cement Concrete Paving, Landscaping Grading, Seeding (no sodding), Trees, Plants, and Ground Cover |
| Visual Display Boards, Removable Stage Platform, Residential Casework, Horizontal Louver Blinds, Barrier Free Lifting Device |
| Phase III |
| Phase IV |
![]() |
| CONSTRUCTION SCHEDULE |
| Target Completion date: |
![]() |
![]() |