Sub: -
Status report on HDBS supplied under Phase II - reg.
The stations are
requested to send the status report as in the attached format (click the link)
(every fortnight by 16th and 1st of each month) on the HDBS supplied to the
station under “Replacement of Console Tape recorder with Hard Disc Based System
at AIR Stations, Phase-III Scheme” of 10th plan till all the installation works
is completed and for another 3 months after the completion of installation about
the working status of the installed items
If the installation is
not yet carried out by the supplier, the supplier may be contacted for
installation immediately under intimation to Directorate.
http://www.ceszairdd.org.in/soundtest/hdbs_status_report.php
Yours
faithfully,
ग. नटराजन / G.
Natarajan
निदेशक (अभि.) / Director (E)
कृते मुख्य अभियंता (द.
शे) / for Chief Engineer (SZ)
To
The
Superintending Engineer / Station Engineer, All India Radio,
Kurnool/Markapur/Hospet/Raichur/Karwar/Bijapur/Devikulam
Ooty/Karaikal/Kavaratti/Madikeri/Tuticorin.