CY 2007 ANNUAL REPORT

 

PROGRAMS AND PROJECTS

 

FOREST MANAGEMENT SERVICES

 

For CY 2007 the Forest Management Services has significantly implemented programs and projects vital for the conservation, rehabilitation and proper management of our country’s natural resources by tapping the assistance and support of other government agencies, local government units, peoples organizations and private individuals. The following were the major activities undertaken during the year.

 

       a.  Management of Forest Lands and Forest Resources

           

1.  Green Philippines Program

 

In support of the PGMA’s Green Philippines Program; TREES FOR LIFE; TWENTY MILLION  SEEDLINGS FOR PLANTING with the  mission  to mitigate climate change, insure water supply security, conserve biodiversity, establish agroforestry, provide livelihood opportunity, sustain supply of forest-based raw materials and the production of alternative source of fuels,  the Region shared the responsibility by targeting 1,482,734 seedlings to be planted instead of 1.25 million seedlings as target distributed per region.  Out of the total target, 447,692 seedlings were sourced out from the regular fund of the region while 1,035,042 seedlings were produced in collaboration and coordination with the different stakeholders.  These include the LGUs, Non-Government Organizations, Peoples Organization and private sectors and individuals.

 

   For the year, the Region  planted a total of 1,504,355  seedlings out of the target of 1,482,734 covering 1,132.78  hectares and 109 kilometer strips in the four thematic areas namely, Protected , Critical Watershed and open lands (377,618 seedlings planted covering 147.04 hectares and 5 kilometer strips), Agroforestry Areas and Fruit Trees (292,404 seedlings  covering 218.55 hectares) and Urban Parks, Green Campuses, Camps & Subdivisions with (182,803) seedlings planted by concerned stakeholders.  Those areas funded by DENR were maintained and protected by the concerned contractors while those areas with Memoranda of Agreement were maintained and protected by the concerned parties and being monitored by the region.

 

The Regional and Provincial launchings in the four (4) thematic areas awakened the consciousness of the general public on the need of planting trees and the value these trees would bring to the environment especially on the issues of climate change, global warming and environmental degradation.

 

The Province of Aklan has a total target of 111,054 seedlings and planted a total seedlings of 111,604 of which 91,650 for the Protected Areas, Critical Watershed and open lands covering 53.0 hectares, 8,354 seedlings for the Agroforestry covering 15.30 hectares, 6,600 seedlings for Urban Parks, Green Campuses, Camps and Subdivision covering 6.75 hectares, 5,000 seedlings for Mangrove and Coastal covering 4.50 hectares.

 

The Green Philippines Program  for the four (4) thematic areas were completely launched by the DENR, Province of Aklan.  The theme PA/Watershed and open forest lands was launched on August 30, 2007 at Tangalan River Watershed in Barangay Panakuyan, Tangalan with Mayor Gene Fuentes, Vice Mayor Jed TIrol, Regional GPP Focal Person Salvador Manglinong, Jr. and RTD Rainer Ecang leading the guest list of officials.  The launching of mangrove areas was held in New Buswang, Kalibo, Aklan on September 19, 2007 with Vice-Mayor Nilda Tambong PNP Provincial Director Durana and Atty. Allen Quimpo former Congressman of Aklan as guest officials.  The Green Campus thematic area was launched in Aklan State University, Brgy. Calangcang, Makato on September 28, 2007 led by Mayor Ramon Legaspi, Jr.  The agro-forestry and fruit trees thematic area was held on December 14, 2007 at Brgy. Julita, Libacao and participated by CBFM PO’s, Schools, PNP and Barangay Officials.

 

In the province of Antique, the total target was 216,912 seedlings and 248,621 seedlings were made available, 115% accomplishment.  The total seedlings planted were 392,667 covering 165.93 hectares with 3,373 planters.  For the Protected Areas, Critical Watershed and Open Lands (40,324) covering 37 hectares, Agroforestry Areas and Fruit Trees (73,087) covering 56 hectares, Urban Parks, Green Campuses, Camps and subidivision 6,845 seedlings covering 11.66 hectares and in Mangrove and Coastal Areas (272,411) seedlings covering 61.27 hectares.

The launching was conducted on August 29, 2007 in the municipality of Pandan.  There were 21,120 seedlings planted in two (2) sites.  In Barangay Aracay, 11,120 Narra seedlings were planted covering an area of ten (10) hectares while in Barangay San Juan 10,000, Narra seedlings were planted covering another ten (10) hectares.

In the province of Capiz, it has a total target of 131,438 seedlings and subsequently it has produced 133,253 seedlings.  The total seedlings planted were 86,513 seedlings covering 55.67 hectares in four thematic areas.  For the Protected Areas, Critical Watershed and Open Lands (13,815) covering 7.52, Agroforestry Aeras and Fruit tres (29,225) covering 18 hectares, Urban Parks, Ground Campuses and Subdivision (42,848) covering 29.15 hectares, Mangrove and Coastal Areas (625) covering 1 hectare.  The Launching was conducted on August 24, 2007.  The planted seedlings totaled to 1,300 covering 6.52 hectares located at Barangay Codingle and Agsirab, Dumarao, Capiz.

 

In the province of Iloilo it has a total target of 254,285 seedlings and were able to produce 270,385 seedlings.  The total seedlings planted were 270,405 seedlings covering 547.36 hectares in four thematic areas.  For the Protected Areas, Critical Watershed and Open Lands (154,925) covering 7.32 hectares, Agorforestry Areas and Fruit Trees (4,180) covering 22 hectares, Urban Park, Green Campuses, Camps and Subdivision (88,300) covering 500.04 hectares and Mangrove and Coastal Areas (25,000) covering 18 hectares.

 

The launching was held at Barangay Gutao, Moroboro, Dingle on August 30, 2007 wherein the participants planted 200 seedlings of Kamandiis and Kobi.

 

In the province of Guimaras the total target was 412,174 seedlings.  The total seedlings planted were 366,264 covering 119.54 hectares and 90.80 kilometers.  For the Protected Areas, Critical Watersheds and Open Lands (2,000) covering 1 hectare, Agroforestry Areas and Fruit Trees (8,590) covering 3.44 hectares, Urban Parks, Green Campuses, Camps and subdivision (26,810) seedlings covering 11.88 hectares and in Mangrove and Coastal areas (328,864) seedlings covering 103.22 hectares.

The province of Guimaras conducted its Provincial Launching of the Green Philippines Program under the Protected Areas Thematic Theme on September 1, 2007 in Barangay Hoskyn, Jordan, Guimaras.  The activity was realized with the financial, material and manpower supports from SMART Communications, Inc. as well as support and cooperation from the Barangay Council of Hoskyn Fisherfolks Association, Inc. (HOFAI).  The activity was highlighted by a mangrove planting inside an area of 2.25 hectares or equivalent to 10,000 propagules.  The planters were composed of 158 participants from executive and employees of SMART Communication, Inc. from Manila, Cebu and Iloilo, DENR regional and provincial executives and staff headed by RTD Alicia L. Lustica and PENRO Oscar Oliveros, students from San Agustin University and Western VIsayas College of Arts and Sciences, barangay officials of Hoskyn and teachers of Hoskyn Elementary School.  Likewise, a Memorandum of Understanding was signed during the activity between DENR PENRO Guimaras, SMART Communications, Inc., Barangay Council of Hoskyn, Jordan and Hoskyn Fisherfolks Association.

 

In the province of Negros Occidental, the total target was 307,247 seedlings and planted a total of 314,902 seedlings covering 164.73 hectares and 5 kilometer strips in the four thematic areas broken down as follows: Protected Areas, Critical Watersheds and Open Lands (74,904) covering 41.20 hectares, Agroforestry Areas and Fruit Trees (168,968) covering 103.81 hectares, Urban Parks, Green Campuses, Camps and subdivision (11,400) seedlings covering 9.90 hectares and 5 kilometer strips and in Mangrove and Coastal areas (59,630) seedlings covering 9.82 hectares.

 

 

2.  Monitoring, Assessment and Reporting

In the strengthening of  Forest Information System (FIS), the Region maintained the 18 installed Forest Information Program in the different offices regionwide. The program was operationalized in the Region Office and provinces of Aklan, Antique, Capiz, Iloilo and Negros Occidental. In the province of Guimaras, the  updating was done by manual entry form due to technical problem in its computer, 100% accomplishment.  Likewise, the Region, in coordination with the Forest Management Bureau (FMB) conducted a refresher Training on the Operationalization of the Forestry Information System Component on November 27-28, 2007 held at Iloilo Grand Hotel, Iloilo City.  It was participated  by 37  personnel from the Region Office, and provinces of Aklan, Antique, Capiz, Iloilo , Guimaras and Negros Occidental handling the FIS in their respective offices. Moreover, the Region facilitated the procurement of thirteen (13) units of computers distributed to the Region and CENROs including PENRO Guimaras purposely for the use of FIS. The budget was provided by the Forest Management Bureau funded by the International Tropical Timber Organization (ITTO).

 

 

3.  Generation/Collection of Revenues/Fees/Dues

 

In the generation/collection of revenues/fees/dues, the Region generated a total of P2,262,218.87 revenues/fees/dues.   These fees were collected as fees and forest charges for the use of forest products and the land itself.

 

 

      4.   Licensing

 

For licensing, the Region had processed and acted a total of 7,822 applications for CY 2007.   These were applications for permit to transport forest products,  Certificate of  Registration of Chainsaws and Registration  of Lumber Dealers and Resaw Permits.  Most of these applications came form the province of  Aklan where the sources of forest products came from the different municipalities.

 

 

      5.  Scaling/Re-scaling

 

Under scaling/re-scaling activities, the Region had re-scaled a total of 8,482.78 cu.m. and scaled 88,158.92  cu.m for CY 2007. The scaling was done in forest products generated from private plantations and those with appropriate tenurial instrument in the region to determine their legality while being transported and re-scaling was done in the lumber shipment of forest products coming from other regions.

 

      b.  Plantation Establishment, Maintenance and  Protection

 

 

      1.  Plantation Establishment

 

For CY 2007, the Region has a total target of 98 hectares for plantation establishment of which 55 hectares were under the new contracts while 43 hectares were contracted in late December 2006.  At the end of the year, these contracted areas were fully planted, 100% accomplishment.  These 55 hectare forest plantations were located in Brangay San Jose, Ibajay, Aklan covering 10 hectares and contracted by CHeril Balinario; in Barangay Aracay, Pandan, Antique covering 10 hectares and contracted by Josue Sabino;  in Barangay Tugaslon, Alimodian, Iloilo covering 21 hectares contracted by the LGU of Alimodian and in Barangay Kumaliskis, Don Salvador Benedicto covering 3 hectares and contracted by the Barangay Council of Kumaliskis represented by Ma. Fe Agravante and 11 hectares contracted by the Barangay Council of Pinowayan, Don Salvador Benedicto in Negros Occidental.

 

 

            2.  Plantation Maintenance and Protection

 

On area maintained, a total of 569 hectares was continually maintained by the Region or 88% accomplishment for CY 2007.   The activities done were brushing, ring weeding and foot patrolling in the newly planted areas. The low accomplishment was due to the 75 hectares contracted by the Local Government of Dumalag, Capiz which was damaged by the typhoon in CY 2006.  The area was not yet re-planted due to changes in political leadership in the said municipality. The  issue was already addressed by the management during its  Regional Management Conference held  on December 3-4, 2007 and corresponding recommendations were already made.  Expectedly, these recommendations will take effect in the early part of the 1st quarter of CY 2008.

     

     

            3.   Seedling Production

 

At the end of the year, there were 139,384 seedlings of various tree species produced, around 120% of the target.  Out of these seedlings produced, 109,584 are being credited as backlogs of CY 2006.

 

 

      c.   Forest Protection Program

 

Law enforcement is very crucial activity in Forest Management Sector which needs manpower, detailed information and rigid  documentation in terms of surveillance, investigation and the filing of case as the need arises.

 

Under Protection of Untenured Forest Areas, a total of 264,016.86 hectares was the subject of protection activities of the region.  In line with this, 90 ground surveillances were conducted by the forest rangers which were assigned into twenty six (26) patrol sectors.

 

 Likewise, 19 chokepoints were maintained in the provinces of Capiz, Iloilo and Negros Occidental in order to regulate the flow of the forest products and also to minimize illegal transport of forest products with the involvement of the Philippine National Police and Local Government Units. For the province of Capiz, these chokepoints are located in Barangays Culasi, Roxas City and Poblacion, Ivisan, Capiz. For the province of Iloilo, these are located in the municipalities of Guimbal, Santa Barbara, Zarraga and Janiuay.  For the province of Negros Occidental these are being maintained in Mandalagan, Sum-ag, Mansilingan Bacolod City, Silay and Crossing Messing Bago, Barangay Punao, San Carlos, Barangay Jonob-jonob  Escalante City, Crossing F1, Sagay City, Crossing Cadiz City, Brgy. XX1 Victorias City,  Cauayan Town Proper and Brgy. Cartagena, Sipalay City.

 

Eleven (11) community fire brigades/crews were strengthened/mobilized in the province of Antique in order to augment the police force of the Office. These are located in the Barangay Barusbus, Libertad, Brgy. Osorio Culasi, Brgy Tuno Tibiao. Barangay Haguichikan, Laua-an Brgy San Andres, Culasi, Brgy. Alujipan, Culasi, Brgy. Buenavista Culasi, Brgy. Paningayan, Culasi, Brgy. Aningalan, San Remegio, Brgy. Tordesillas, Sibalom, Brgy. Imparayan Sibalom.

 

Three (3) hotspot areas in the province of Iloilo were neutralized located in Iloilo City Wharf, Calinog and Lambunao, Iloilo.

 

Seven (7) Multi-Sectoral Forest Protection Committees were strengthened in the Region Office and in the provinces of Aklan, Antique, Capiz, Iloilo, Guimaras and Negros Occidental.  These MFPCs are composed of inter-agency representatives who discussed possible measures in the protection of the remaining forest. In line with this, the Region conducted three (3) series of trainings on forest protection concerning environmental laws, rules and regulations and one (1) Forest Protection Summit  in order to update the members on the new guidelines on forest protection as well as on environmental laws, rules and regulations. These trainings were  the following;

 

Training of the Peoples Organization (POs) coming from Nabas, Malay and Buruanga, Aklan and Libertad Pandan, Antique as Wildlife Enforcement Officers (WEO) and prospective Deputized Environment and Natural Resources Officers.  The training was conducted on June 26-27, 2007 participated by 60 participants held in Jawili Training Center, Tangalan, Aklan. It was conceptualized considering that the area of Northwest Panay Peninsula Natural Park has still vast of forest resources but it is now facing all sort of human destructions.   The Office believes that there is a need to educate and empower the people living to the adjacent forest lands to protect and conserve the natural resources therein.

 

Enhancement Training of Forest Officers in Panay on Forestry and Related Environmental Laws, Rules and Regulations held at DepEd Regional Education Learning Center, Duran street.   Iloilo City on August 22-23, 2007.   It was participated by 75 participants composed of Foresters and Forest Rangers.  The two (2) day training was conducted purposely to develop competence of Forest Protection Officers in carrying out their responsibilities and likewise, to identify issues and concerns in the implementation of forest protection activities within their area of jurisdiction.  Based on the issues and concerns identified by the participants, an action plan was formulated to serve as a guide for the conduct of intensive forest protection activities in the Region.

 

Training of some members of CBFM/ISF Peoples Organization of Libacao, Madalag and Malinao Aklan as a Prospective Deputized Environment and Natural Resources Officers was held at Jawili Training Center, Tangalan, Aklan on September 20-21, 2007.

 

A total of 23 participants attended the said training , equivalent to 400 participants. The main objective of the training was to appraise and equip some members of the POs and ISF beneficiaries within the DENR projects in Madalag, Malinao and Libacao with the latest policies and regulations of the DENR to effectively protect and conserve the remaining forest resources within the said municipalities.

 

A Regional Multi-Sectoral Forest Protection Summit was held at CAP building, San Jose, Antique on November 19, 2007.  This was conducted to foster awareness among stakeholders of forestland areas of the region and to muster support and cooperation, protection and preserving our forest resources.  Likewise, it was conducted to address prevailing issues and concerns in the implementation of forest protection activities. The summit was participated by 75 participants equivalent to 570 participant hours composed of the Regional Multi-Sectoral Forest Protection Committee, Provincial and Municipal Multi-Sectoral Forest Protection Committee, heads and representatives of the Local Government Units, National Government Agencies, Non-government Organizations, Private Sector and Civil Society.

 

A total of 139.76 cu.m. of  forest products was seized during the year composed of lumber, casco, banca, logs , charcoal and 128 pieces of rattan and 765 rattan splits and 91.65 cu.m. assorted forest products were confiscated broken down as lumber/logs (57.93 cu.m), lumber (25.83 cu.m.)  boat hull (7.89 cu.m) and finished products composed of 1 set round table, 1 set oval table, 2 sets matrimonial bed in the Province of Capiz  and  2 rocking chair, 3 side table, 5 center table, 9 oval dining table, 2 round dining table, 90 dining chairs and 15 pieces  standard Cleopatra.

 

 

     d.   Community Based Forestry Program

 

            1.  Agroforestry Development

 

Under Agroforestry Development, a total of 89 hectares was developed for CY 2007.  These areas were planted with forest and fruit trees and also cash crops like peanuts and pineapple. Under the new plantation, 69 hectares were established and 12 hectares were planted under supplemental fund for CY 2006.  These plantations were established in the identified DA-DAR-DENR Convergence sites located in Barangay Rosal, Libacao, Aklan (15 hectares), Barbaza Antique (21) hectares), Barangay Traciano and Barangay Tabun-acan, Pilar (16 hectares), Barangay Nazuni, Dingle (22 hectares) and Barangay Talacdan, Cauayan, Negros Occidental (16 hectares )

 

 

  2. Orientation Workshop on CBFM strategic   Plan Preparation

 

An Orientation Workshop on CBFM Strategic Plan Preparation was conducted by Central Office personnel at Iloilo Grand Hotel last September 17-18, 2007 participated by 39 personnel from DENR Regional Office, PENR Officers, Planning Officers, and CBFM Peoples Organization. A Provincial CBFM Strategic Planning Workshop was conducted at Jawili Training Center, Tangalan, Aklan for the provinces of Aklan, Antique and Capiz last September 25-28, 2007.   It was attended by  69 participants from the  DENR Regional Office, PENROs and CENROs  of Aklan, Antique and Capiz, Local Government Units, Non-government Organizations, Peoples Organizations and Academic Institutions.   Likewise, the Provincial Strategic Planning Workshop for the provinces of Iloilo, Guimaras and Negros Occidental was conducted on October 19-22, 2007, spearheaded by RTD Rainer M. Ecang to come up with the respective 10-year CBFM Provincial Strategic Plan of the above mentioned provinces.

 

 

3.  Capability Building of CBFM and other  Community Forestry Programs

 

The Region conducted a training on Natural Farming Systems to the Agrarian Reform Community  - Beneficiaries of Barangay Sebaste, Sibunag, Guimaras on November 27-29, 2007 and Barangay Nazuni, Dingle, Iloilo on November 17-18, 2007.  The trainings were conducted as a continued technical support of the agency to the People’s Organization in CBFM areas in the region.

 

It has also conducted Leadership and Livelihood Training to ISF Beneficiaries of Barangay Sinugbuhan, San Joaquin, Iloilo.

 

 

 

 

       e. Soil Conservation and Watershed Management

 

Under Watershed Characterization, three (3) watershed areas were characterized for  2007 simultaneously with the preparation of the respective watershed management plan.  These were the Mambusao River Watershed in Mambusao, Capiz which was started in  late December of 2006 and Aganan  and Tigum River Watershed in Iloilo Province, 100% accomplishment.

 

Mambusao River Watershed covers a total area of 44,815.14 hectares  covering the municipalities of Mambusao (26 barangays with 11,870 hectares) Jamindan (29 barangays with 22,160 hectares),  Sigma (21 barangays  with 10,170 hectares), Dao (2 barangays with 615.14 hectares)

 

The  Aganan  River  Watershed covers a total of approximate area of 32,306.25 hectares encompassing portions of 8 municipalities namely Alimodian, Maasin and the City of Iloilo while Tigum Watershed has a total area of 25618.4607 hectares covering 5 municipalities namely, Cabatuan, Maasin, Janiuay.

 

The conduct of watershed characterization was done by the team from the concerned offices in close coordination with the covered municipalities and barangays.

 

 

        f.  Land Classification

 

For the  delineation of forest lands, a total of 620.382  kilometers was  delineated for CY 2007 or 101%  accomplishment against the annual target of 613 kilometers.  These were conducted in the municipalities of Ajuy, Anilao, Banate, Barotac Nuevo, Barotac Viejo, Lemery, San Enrique, San Rafael, Sara.   It is expected that the province of Iloilo will be completely delineated this coming CY 2008 once the needed budget will be made available.

 

 

Back to Table of Contents

 

 