804
W. BLOOMlNGDALE AVE., SUITE 3 BRANDON, Fl 33511 Phone: (813) 684-7398
Fax: (813) 684-7398
January 12, 2004
Mr. G. R.
Massimei River Hills
Valrico,
FL 33594
Re: Final
Estimate - Addition of gate house & office addition
Dear Mr. Massimei:
We propose to furnish all materials and perform all specified labor necessary to complete addition/renovation from the drawings provided by you:
- All plans and required permits.
- .Addition to be 34' L x 20' W.
- Excavation and tree removal.
-Monolithic footer and slab or stem wall and slab.
- Exterior concrete to consist of door
stoops.
-CMU walls
with poured top course and lintels.
- Trusses and 1/2" roof sheathing.
-Extension
of guard house roof line to match addition.
- Interior renovation of guard house.
-25/30 year
shingles over entire structure.
-R-30
ceiling insulation and R-5 wall insulation.
-
Five windows and three exterior entry doors with crash
hardware are included. ,
-
Hardi panel siding over the new and existing building.
- Plumbing
to code.
-
HV AC to be a new 2-ton unit
- Electric
to code to include two ceiling fan outlets and required comminations
wiring.
- Included
in this proposal is the addition of a 100 amp transformer for the existing building.
-
Interior, exterior trim and finishes to match existing as close as possible.
- Drywall
complete ready to paint.
-
Painting of all new work.
- Rear retaining
wall, with drainage, is included.
- Removal
of all construction debris.
The
following allowances are included in this proposal:
- Cabinets/tops $2,000.00
-
Ceramic tjle - material only $2,,200.00
- Electrical
fixtures $ 400.00
The
following is not inc1uded in this proposal:
- Any TECO pricing of the new line/transformer lugs to the Gate House.(See Attached)
- Impact
Fees.
-
Appliances
Option 1 - Removal of existing curb and installation of roll-back curb - Thirty Eight Dollars per linear foot ($38.00 per If).
All of the
above work to be completed in a substantial and workmanlike manner for the sum
of Seventy Three Thousand Nine Hundred and Eighty Dollars
($73,980.00). Any alteration or
deviation from the approved plans and specifications involving extra cost of
material or labor will only be executed upon written orders for same, and will
become an extra charge over the sum mentioned above. All agreements must be in
writing.
Respectfully
submitted by,
![]()

George
Ruhle
President