Rose Run INC.
Just another set of pics from the same time period.
Peanut 4 1/2"
Here's a shot of the driller on that crew loading Mike's company truck with scrap to take in. This is a good shot of the 4 1/2" well casing. This is the last batch of pipe to be run in after the well is TDed (Total Depthed). Then it's cemented off until the fraquers come in with the service rig and get it ready to be tied into. This is also the pipe that damaged my neck. Each one of these are over 40' long except for the pup joint laying in front. They average in weights between 500 to 750 pounds each. Try having one of thos bounce off your hard hat. hehehehe
Peanut
Survey
This is the driller of that tour. Can't remember his real name they just call him peanut cause he's so small. hehe
Survey2
Here they're getting ready to take a deviation survey on this connection. This lets them know how they're kick off is going for the directional angle they are trying to get.
Lights
More of the survey.
Lights2
Decent shot of the derrick all lit up at night.
Lights3
Not such a decent shot but it's still a shot. hehe
This one is another decent one of the lights.
Next Page
Hosted by www.Geocities.ws

1