2008 "Day of" and
"2 week post burn" Pictures
These pictures were taken on the day of the burn (3-11-2008) and then 2 weeks post burn by CBC.
The fuel load in these pictures happen to be a mix of Brome grass and Tall Blue Stem (CRP).
This picture gives an idea of the fuel load on this particular area and the back fire operation going on also.
The primary fuel on this part of the operation happens to be Brome grass.
BACK
HOME
Hosted by www.Geocities.ws

1