Ethanol Turbine ( Biomass )

 

 

 

 

 

.   Clean and renewable power cogeneration (electricity and heat).
.   Its power/steam production does not depend directly on sugarcane harvests.
.  Use of ethylic alcohol to power this turbine eliminates any problems associated with   sugarcane bagasse that, from our standpoint, should continue to be used to power traditional steam boilers and turbines.

 

 

                 Made of carbon or stainless steel.  These turbines are powered by ethylic alcohol (biomass), a renewable, ecological energy.    
             These turbines work under both single cycle (aeroderived) and combined cycle conditions to produce clean energy (electricity and heat).           
                They work under the same conditions as any other gas or liquid-powered turbines used in cogeneration systems and traditional thermoelectric plants, as well as in operation of any known means of transportation, such as airplanes, ships, trains, buses, trucks, etc.
               In sugar and alcohol production facilities, they can be used for the production of thermal power and heat, and complement sugarcane bagasse-powered thermoelectric plants or even replace them, as alcohol production in such facilities is permanent, abundant, and cost-effective.
               These turbines discard the traditional boilers, as they fully use the heat produced by their hot exhaustion gases, like in natural gas turbines. 
               They work perfectly as microturbines, and meet small residential/commercial demands to large industrial demands.

 

 

Aeroderived Turbine 

 

 

Combined Cycle Turbine 

 

 

Turbine price:



Price of each KW produced is equivalent to its international price of  US$ 1000.

  

Manufacture:


Manufacture of our products is fully outsourced to our worldwide network of accredited partners. This is the reason why our delivery time is unique.

 

        

Manufacture Warranty:


Our equipment is warranted against manufacture defects only for the maximum period of 15 years.

Forms of Payment:

50% at the date the equipment is ordered.
50% upon the equipment shipment.

 

Sale of turbines:

For retail or wholesale purchase of our 1-KW / 1.5-GW turbines for a delivery period up to 60 days, please send e-mail your order to: [email protected]



Hosted by www.Geocities.ws

1