Page 2.
The base laid for the main platform section .
Kev trimming back the excess concrete from the foundation.
In a weekend, Paul and his mate had 90% of the brickwork done.
The platform foundation.
A nice shot showing both Clives' loco and the stonework laid by Paul.
During a poor weather spell, Kev works on his rolling stock. In the background can just be seen his engine, a Rusten Diesel.
The beginnings of the tunnel.
Despite a considerable wait, Pauls' engine finally turns up. A Diesel utility engine (with up-rated 12volt motor).
At Last! July '02 and some track had finally been laid, well done Clive.
Even the wives get involved. Here's Sue, Pauls new bride, helping with the mortaring between the track joists.
Page 1
Page3
Hosted by www.Geocities.ws

1