Sl |
TEST |
COMMAND |
REMARKS |
1 |
Formatting
Billing Counters |
FMT-BLG-CNTR
in ADD-CAL in ACT IOP |
Formatting
has to be made in both IOPs by using fsnd |
2 |
Runnig AUDIT |
Put
in ADD-CAL |
Run
in calendar 4 times daily |
3 |
Check
of MCU |
DISPL-XCHG-MTR |
Analyse any
abnormal increase or decrease. |
4
|
Check
of PG nos |
DISPL-LSCNT-OOS DISPL-AICNT-OOS |
All
LLO nos should be properly wedged |
5 |
System
Status |
DISPL-SYS-ALL |
Checking
status of IOPs and Switch Units |
6 |
TGP
/ TK Status |
DISPL-TGP-STATUS DISPL-TRCNT-OOS |
Checking
Trunk Group Status |
7 |
Alarms |
DISPL-ARM-LIST |
Checking
of Alarms for power, switch unit, trunks, and dtmf ccts |
8 |
Password
tamper |
Rgen subfac2_2: pa-tm |
Release
password tampered numbers |
9 |
Traffic
Analysis |
DISPL-TRF-RPT |
Check
of CCR in all BMs & TGP and any sudden change should be analysed |
10 |
OOD
Threshold report BMON
Utility |
DISPL-OOD-LOG IOP
5X > BMON 51 PRINT |
Check
the numbers crossed the threshold
value. In
2_1_1_1 s/w only. |
11 |
Village
PTs |
DISPL-SUB-MTR |
Taking
daily meter reading of VPTs |
12 |
Link
Status |
DISPL-LS-STS |
Checking
link status of CCS7 Signaling |
13 |
Data
Back Up |
COPY-OUT |
Taking
ED & BD Backup |
Sl |
TEST |
COMMAND |
REMARKS |
1 |
Free
Disc Space |
IOP
5X > DF |
Checking
of disc space on both IOPs |
2 |
Test
of MFC card |
TST-SRV:301,MF; |
Check
of mfc cards for dtmf |
3 |
Test
of terminal card |
TST-TRML-CARD:401; |
All
terminal cards should be tested |
4 |
Printers |
CHG-OUT-DEV |
Checking
of Printers |
5 |
AC
Plant / Units |
------ |
Checking
of room temperature and functioning |
Sl |
TEST |
COMMAND |
REMARKS |
1 |
System
Time |
SET-SYS-TIM |
Setting
System Time |
2 |
Interchanging
Switch Units and IOPs |
INTCHG |
Check
up all switch units and IOPs on active condition |
3 |
Pulse
rate check up |
From
test calls & NCBR Printouts |
Random
check of total 91, 95, STD, ISD call
pulses |
4 |
Spurt
of > 10,000 units |
From
fortnightly billing record |
Check
of > 10,000 units spurt to normal
call subscriber |
Sl |
TEST |
COMMAND |
REMARKS |
1 |
Stand
by Power Plant |
----- |
Interchange
of Standby Power plant or spare SMPS Modules for load test |
2 |
Check
of RBM DTKs |
------ |
Call
switchover from one stream to another |
Sl |
TEST |
COMMAND |
REMARKS |
1 |
TGP
Route |
DISPL-TGP-ROUTE |
Checking
all TGP Routes |
2 |
Report
on route characteristics |
DISPL-ROUT-CHAR |
Checking
all parameters of all individual routes |
3 |
Charge
Rate |
DISPL-CRG-RTN |
Checking
the pulse rate assigned for each route |
4 |
TGP
Parameters |
DISPL-TGP |
Checking
all parameters of all TGPs |
5 |
Working
Connections |
DISPL-DIRNO DISPL-TEN DISPL-DIRNO-RSRV
|
Working
connection, DNP, Spare, Safe custody nos
verification |
6 |
Spare
nos Checking |
-do- |
Physical
verification of jumpers and dial tone at MDF |
7 |
Zero
meter reading |
From
LCC statements |
Analysing
reason for zero meter reading |
8 |
Billing
data deletion |
DEL-FGP-FILE |
Ensure
backup for 3 earlier billing cycle |
Sl |
TEST |
COMMAND |
REMARKS |
1 |
Traffic
data deletion |
DEL-FGP-FILE |
Ensure
BACK UP and delete tf, ioh,
bc |
Sl |
TEST |
COMMAND |
REMARKS |
1 |
Earth
Value |
By
disconnecting exchange |
Checking
earth value of exchange, P/P and E/A |
2 |
Efficiency
of Battery |
Manual
discharge and charge |
Measure with
artificial load
|