EDIFICACION E INSTALACIONES ELECTROMECANICAS CARFAM

The one that subscribes Lic. Liliana Santamar�a Osuna, has the affability to go to You in order to make him know our trajectory and antecedents our company and offer our services to them.

The CARFAM objective is the Electromechanical Construction and Facilities, by means of the execution of public works, deprived and support to the industry in general. Developing with professionalism and honesty the services that are asked for.

ABILITY TO WORK:

MADE WORKS

    1.-COMITENTE: CASA NORSAGARAY

    WORK: Project and installation of the system of power supply

    LOCATION: Cumbres de Ju�rez

    AVANCE: Finished

    2.-COMITENTE: CENTRO DE SERVICIOS DE GOBIERNO DEL ESTADO

    WORK: Waterproofing of ceiling of center of services of beaches of Rosarito

    LOCATION: Playas de Rosarito

    ADVANCE: Finished

    3.-COMITENTE: COMITENTE: CLUB CAMPESTRE

    WORK: Replacement of cooling pipe main to water units of dimensions of 6 inches up to 2 inches, includes iron tubes certificate 40, pipe PVC certificate 80, insulators type average Fiber glass canes.

    LOCATION: Colonia aviadores

    ADVANCE: Finished

    4.-COMITENTE: GUADALUPE OLEA

    WORK: Remodeling of house room and extension of the same one

    LOCATION: Blvd. D�az Ordaz 5 y 10 Tijuana B.C

    ADVANCE: Finished

    5.-COMITENTE: COMITENTE: : MOTEL PONTENOVA

    WORK: Installation of mains

    LOCATION: ubicado enseguida de la Toyota en Tijuana B.C

    ADVANCE: In construction

    6.-COMITENTE: CLUB CAMPESTRE

    WORK: Provision and installation of 10 conditioned air units divided type of 5 tons of capacity each one

    LOCATION: Colonia aviadores

    ADVANCE: Finished

    7.-COMITENTE: COMITENTE: : ARQ. REMEDIOS VERASTICA

    WORK: Planes for permission of electrical systems for house room

    LOCATION: Av. Centenario # 102 privada centenario

    ADVANCE: Finished

    8.-COMITENTE: SECRETARIA DE EDUCACI�N ESTATAL SEE

    WORK: Construction of 7 classrooms of slight type

    LOCATION: Fraccionamiento el dorado

    ADVANCE: Finished

    9.-COMITENTE: COMITENTE: : PREESCOLAR ABRAHAM LINCOLN

    WORK: Construction of cement launching slips and ceiling of metallic structure

    LOCATION: Tijuana

    ADVANCE: Finished

    10.-COMITENTE: ESCUELA PRIMARIA ING. JOS� G. VALENZUELA.

    WORK: Rehabilitation of 40 mts of drainage of sanitary modules

    LOCATION: Blvd. Fundadores

    ADVANCE: Finished

    11.-COMITENTE: ESCUELA PRIMARIA EMILIANO ZAPATA

    WORK: : Installation and provision to 8 scholastic modules of mains, illuminated and earth system

    LOCATION: Contra esquina de palacio municipal en Tijuana B.C

    ADVANCE: Finished

    12.-COMITENTE: ESCUELA PRIMARIA ABRAHAM LINCOLN

    WORK: I calculate and installation of bank of capacitores

    LOCATION: Playas de Rosarito

    ADVANCE: Finished

    13.-COMITENTE: CONSTRUCTORA GELZA (ING. SANTANA LICON )

    WORK: : Project and installation of mains, conditioned air, video, data network and telephony

    LOCATION: Blvd. D�az Ordaz y Benton

    ADVANCE: Finished

    14.-COMITENTE: MAQUILADORA CON RAZ�N SOCIAL DE PULSE POWER DE MEXICO

    WORK: Elaboration of planes, correction of hydraulic electrical systems, maintenance, verification by U.V.I.E, you transact before CFE.

    LOCATION: parque industrial Tijuana (ing. feliz Antunez).

    ADVANCE: Finished

    15.-COMITENTE: CONSTRUCTORA DECO

    WORK: Project and installation of substation type transition (aerial) of 75kva of delta to star

    LOCATION: Col. Las Brisas

    ADVANCE: Finished

    16.-COMITENTE: INNET EN EL DIF

    WORK: Main power supply for network of I compute and power supply and fotocontrol for luminous announcement

    LOCATION: Matamoros Tijuana.

    ADVANCE: Finished

    17.-COMITENTE: JOSE LUIS VERDUZCO M. ( DUE�O)

    WORK: : Installation of substation for 225 industrial platforms of Kva. Type pedestal, general Maintenance of machinery and systems of extraction

    LOCATION: Col. Obrera

    ADVANCE: Finished

    18.-COMITENTE: Cruz Roja

    WORK: I calculate of system of air pressure and drying of he himself for impulsarequipo of surgery

    LOCATION: Tijuana.

    ADVANCE: Finished

    19.-COMITENTE: ARIANA SUR NIEDEN, TEL: 686-4744

    WORK: : Remodeling of offices of telemarketing includes design of cub�culos, effects of table rock, preparation of divisions, carpets telephony, conditioned air, hydraulic network of power supply, facilities, sanitary, maintenance.

    LOCATION: Col.Cacho Tijuana

    ADVANCE: Finished

    20.-COMITENTE: SINDICATO DE BUR�CRATAS

    WORK: : Rigid installation of plaf�n

    LOCATION: Casa de jubilados calle 7 ma. Zona Centro

    ADVANCE: Finished

    21.-COMITENTE: CASA DE JUBILADOS EN SINDICATO DE BUR�CRATAS

    WORK: : Design and installation of effect in facade

    LOCATION: calle 7 ma. Zona centro

    ADVANCE: Finished

    22.-COMITENTE: GUARDER�A DEL SINDICATO DE BUR�CRATAS

    WORK: : Construction of measurement system M-5 type

    LOCATION: V�a Rapida Oriente

    ADVANCE: Finished

    23.-COMITENTE: SINDICATO DE BUR�CRATAS.

    WORK: : Maintenance of concentrator of measurements so that it fulfills the norms of operation of C.F.E.

    LOCATION: calle 7 ma. Zona centro

    ADVANCE: Finished

    24.-COMITENTE: SINDICATO DE BUR�CRATAS.

    WORK: : System of extraction in infantile dance hall

    LOCATION: calle 7 ma. Zona Centro

    ADVANCE: Finished

    25.-COMITENTE: JOSE LUIS VERDUZCO M ( DUE�O)

    WORK: : Study for saving of energy in industrial platforms

    LOCATION: Col. Obrera

    ADVANCE: Finished

    26.-COMITENTE: CRUZ ROJA

    WORK: : Installation of system preloaded of 315 gallons of water by means of a system of pumping with two motobombas of 5 HP each one, with network of copper pipe, automated by pressure switches.

    LOCATION: Tijuana

    ADVANCE: Finished

    27.-COMITENTE: EMPRESA CLAYRSON DE M�XICO ( DUE�O)

    WORK: : System against fire

    LOCATION: Col. Obrera

    ADVANCE: Finished

    28.-COMITENTE: HOSPITAL ONCOL�GICO INFANTIL

    WORK: : Leveling of floors and construction of cupola

    LOCATION: enfrente del IMSS # 1

    ADVANCE: Finished

    29.-COMITENTE: HOSPITAL ONCOL�GICO INFANTIL ( DUE�O)

    WORK: : Aid for installation of conditioned air system

    LOCATION:enfrente del IMSS # 1

    ADVANCE: Finished

    30.-COMITENTE: CLUB CAMPESTRE

    WORK: : Provision and installation of separating air tank for water system frozen with its valve of 2�

    LOCATION: Colonia aviadores

    ADVANCE: Finished

    31.-COMITENTE: CLUB CAMPESTRE ( DUE�O)

    WORK: : Aid for installation of conditioned air system

    LOCATION: Colonia aviadores

    ADVANCE: Finished

                                          PRESENTATION                               TECHNICAL PERSONNEL                             CONTACT                                          
Hosted by www.Geocities.ws

1