B51 Blowfly Cave (connects to B16)

Grid Ref. 88604448

Depth: 45w Length: 73.9m

Equipment Required:

1st pitch:- tree protector, 38m rope, 38ft ladder, 1 tape

2nd pitch:- 38w rape, 2 tapes, 9Oft ladder

If abseiling:- 58m rope

The 100mw a 100mm steel bar at the entrance can he used as the main tape/ladder attachment point. A backup ballard is provided at the south of the entrance. The 8.6m diameter, concrete entrance deeps into a rift which is the first pitch of 6m. At the top of the pitch is a chamber 1.5m high, 3m wide and 6.8m long.

The first pitch leads to a ledge, 1m wide and 7m long with a soil and leaf littered floor. The second pitch of 13m leads to another smaller ledge and a further 10m pitch. The way on is up the floor canyon to Middle Aven. The law crawl at the bottom of the pitch leads to 3m of low bread passage which then drops 3m into a floor canyon and continues fee a further 6w. Giving way to a low passage which is silted up after lOw. This passage was previously known to continue further (Ellis er. al. 1972).

Disclaimer

Back to Bungonia Caves

Back to Cave Listings

Back to Home Page

Last Revised: 14/10/99 at 8:03pm