Salient Features of KBD Project 

1 The Main Reservoir of the Dam  
  Total Storage 7.9 MAF (9,750 million cu m)
  Usable Storage

Dead Storage

6.1 MAF (7,550 million cu m)

1.8 MAF( 2,200 million cu m)

  Retention Level El.915-ft above MSL (278.9 m)
  Min Reservoir Level El.825-ft above MSL (251.5 m)
  Area at Retention Level 105,000 acres ; (164 sq.m=425 sq. km)
3 Main Dam  
  Crest Elevation

Crest Width

El. 940-ft above MSL (286.5 m)

50 ft (15.2 m)

  Max Height 260 ft (79.2)
  Length

Length (overall)

4375 ft

11000 ft 3350 m)

4 Catchment Area of the Dam 110,500 sq. miles
5 Fill Volume

Main + Closure Embankments

Intake Embankments

Right Auxiliary Embankments

Guide Bunds, Cofferdams etc

 

 
    1. million cu m

5.9 million cu m

  1. million cu. m

10.5 million cu m

6. Overflow Spillway  
  Sill Level El. 860-ft above MSL (262.1 m)
  No and size of radial gates

PMF Discharge

10 No. 50ft (15.2 m ) w x 55 ft (16.8m )

0.98 million cusecs (1.07 million cusecs)

7. Project Cost  
  Based on Cost at June 1987 US $ 2.65 billion
  Present Estimated Cost US $ 8-10 billion
     
8. Orifice Spillway  
  Sill level

No and size of radial gates

785 ft (239.3m) SPD

10 No. 38 ft (11.6 m) w x 22 ft

 

9.

 

 

 

 

10.

Convertible conduits

No & Size of Conduits

Average Length

Lining

 

No & Size of gates

Upstream bulkhead

Upstream radial

Downstream radial

 

 

 

4-36 ft (11 m) diameter

940 ft (286.5 m)

Steel with concrete encasement

 

 

1-36 ft (11 m) w x 36 ft (11m)

4-36 ft (11 m) w x 36 ft (11m)

2-35 ft (10.7m) w x 36 ft (11m)

 

11. Power Facilities

No and size of intake gates

Upstream bulkhead

Upstream radial

 

 

 

2-36 ft (11m) w x 36 ft (11m)

8-36 ft (11m) w x 36 ft (11m)

12. Penstocks

Size and average length

Lining

 

36 ft (11m) diameter, 850 ft

Steel with concrete encasement

 

13 Power Station

Type

No. of Units

Installed Capacity

Turbines, design head

Generators, nominal/maximum rating

 

 

Indoor

8 (initial); 12 (ultimate)

2400 MW (initial); 3600 MW (ultimate)

Francis Type, 170 ft (51.8m)

13.1

Irrigation Benefits

Increase in future annual irrigation supplies (Average)

 

 

 

4.5 MAF (5.500 million Cum)

13.2

 

 

 

 

 

13.3

Energy generation

At KBD

Extra at Tarbela

Total

 

Power Available (initial eight units)

Max Power

Dependable Power

 

11413 million kWh

236 million kWh

11749 kWh

 

 

2776 MW

1463 MW

References:

  1. Rashed A. Saeed, KBD Project; A Scientific Analysis, Print Associates Int’l Islamabad, 1995
  2. Kazi Abrar, KBD The Sindh Case, Creative Communications, Hyderabad, 1998

 