Donation

If you feel that this paper is valuable for you, please give donation to:

    Agus Sugiyono

    Bank Bukopin - Kebayoran Baru Branch

    Jl. R.S. Fatmawati No. 7, Jakarta, INDONESIA

    Account No. 070-100-7743

It will support our future research. Thank you very much.


Kebutuhan dan Penyediaan Energi di Industri Smelter Tembaga
(Energy Demand-Supply in Copper Smelter Industry

Abstract

    Law No. 4 of 2009 on mineral and coal has pushed Indonesia to implement the advancement mineral’s value-added in the country, particularly for copper. Indonesian has copper reserves of 28 million metric tons that is enough to produce for the long term. In addition, PT Smelting now can process only one-third of the copper concentrate supply from PT Freeport Indonesia and PT Newmont Nusa Tenggara, therefore there is an opportunity to process copper concentrate in the country. Assuming that in 2015 the country will require new smelter industry with a production capacity of 350 thousand tons per year, in consequence the energy requirement for copper smelter industry will increase from currently at 0.50 million BOE to 1.08 million BOE in 2015. The power plant needed for the new smelter industry will have an installed capacity of 58.4 MW that supplied using gas turbine power plant.