This page hosted by Get your own Free Homepage

WYN Great Black Shark

HR4 Tournament

Game 204

Darren F. Gideon

versus

John Trauger

ISC TCA

JOHN TRAUGER WINS

Game started 12 November 1998
Last Update 28 February 1999
Current Impulse 2.17

Darren F. Gideon in the WYN Great Black Shark
John Trauger in the ISC TCA
Moderated by Catman
MY SFB PAGE


Turn 1
Turn 2
Latest Map

TURN ONE

START:
=======================
SHIP   HEX     SPEED     
-----------------------
TCA    1701D   17
GBS    2530A   18
-----------------------

END OF TURN:
=======================
SHIP   HEX     SPEED     
-----------------------  
TCA    1006C   17
GBS    2115A   26
WD1-2  1814A   20
IP1    1006C   32
-----------------------  

MOVEMENT:
IMP    TCA     GBS     WD1-2   IP1
------------------------------------
 1     -----   -----
 2     1601E   2430A
 3     -----   -----
 4     1501E   2429A
 5     -----   -----
 6     1401E   2329A
 7     -----   -----
 8     1301E   2227F
 9     -----   2226F
10     1201E   -----
11     -----   2126F
12     1101E   -----
13     -----   2025F
14     1001E   -----
15     -----   1925F
16     0901E   1924F
17     0801E   -----
18     -----   1823F
19     0701F   1723F
20     -----   1622F
21     0702D   1621A
22     -----   -----
23     0802D   1721A
24     -----   1720A
25     0803D   1819A
26     -----   1818A
27     0904D   -----
28     -----   1918A   1817A*
29     0905D   1917A   1816A
30     -----   2016A   -----
31     1005C   2015A   1815A
32     1006C   2115A   1814A   1006C*

* - launched


IMPULSE ACTIVITY:
=======================
00.2   ISC announces Speed 17.
       WYN announces Speed 18.
18.6A4 WYN announces acceleration to Speed 26.
19.6A2 WYN accelerates to Speed 26.
25.6D2 WYN fires four standard disruptors (A-D) at ISC #1 shield,
        range 17.
27.6B6 WYN launches two drones (WD1-2), speed 20, facing A.
32.6B6 ISC launches 40-point plasma (C), heading C, speed 32,
        designated IP1.
32.6D2 ISC fires PPD at WYN, centred on #6 shield, range 14.

25.6D2 WYN DAMAGE to ISC:
WEAPON       ROLL  DAMAGE
------------------------------
DISRUPTOR A   3        2
DISRUPTOR B   4        0
DISRUPTOR C   6        0
DISRUPTOR D   2        2
                    ======
SUBTOTAL               4          
REINFORCEMENT          0 
DAMAGE TO #1 SHIELD    4

32.6D2 ISC DAMAGE to WYN:
WEAPON       ROLL  DAMAGE
------------------------------
PPD       A   8      1+3+1
                    ======
SUBTOTAL             1+3+1
REINFORCEMENT        0+0+1
DAMAGE TO SHIELDS    1+3+0 (5/6/1)

End of turn.  EAFs due 14 January at 1800 EST.







TURN TWO

START OF TURN:
=======================
SHIP   HEX     SPEED     
-----------------------  
TCA    1006C   17
GBS    2115A   16
WD1-2  1814A   20
IP1    1006C   32
-----------------------  

CURRENT:
=======================
SHIP   HEX     SPEED     
-----------------------  
TCA    0914C   19
GBS    2710A   20
WD1    destroyed
WD2    0913E   20
IP1    impacted
-----------------------  

MOVEMENT:
IMP    TCA     GBS     WD1-2   IP1
------------------------------------
01     -----   -----   -----   1106C
02     1107C   2214B   1813A   1206C
03     -----   -----   -----   1307C
04     1108C   2315B   1713F   1407C
05     -----   -----   1612F   1508C
06     -----   2414B   -----   1608C
07     1009D   -----   1512F   1709C
08     -----   2514B   1411F   1809C
09     1010D   -----   -----   1910C
10     -----   2513A   1312F   2010C
11     0911D   -----   -----   2111C
12     -----   2612A   1211F   2210C
13     0912D   2611A   1112E   2310B
14     -----   -----   -----   2410C
15     0812D   2711A   1012E   2510B
16     0813D   2710A   0913E~  2609B
17     0914C   -----   -----   2710C@

@ - impact or destruction
~ - one drone destroyed

IMPULSE ACTIVITY:
=======================
01.2   ISC announces Speed 17.
       WYN announces Speed 16.
01.6D2 PPD hits with second pulse.
02.6D2 PPD hits with third pulse, now centred on shield #5.
03.6D2 PPD hits with fourth pulse.
04.6A4 ISC announces deceleration to speed 15.
05.6A2 ISC decelerates to speed 15.
07.6A4 WYN declares acceleration to speed 20.
08.6A2 WYN accelerates to speed 20.
15.6A4 ISC announces acceleration to speed 19.
16.6A2 ISC accelerates to speed 19.
16.6B4 ISC labs WD1-2.
16.6D2 ISC fires a Phaser-3 each (7,8) at WD1-2, range 1.
       WYN fires five Phaser-3's (1-3,10,11) at IP1, range 1.
17.6A2 IP1 envelops WYN.
       WYN player concedes.

01.6D2 ISC DAMAGE to WYN:
WEAPON       ROLL  DAMAGE
------------------------------
PPD       A          1+3+1
                    ======
SUBTOTAL             1+3+1
REINFORCEMENT        1+3+0
DAMAGE TO SHIELDS    0+0+1 (5/6/1)

02-03.6D2 ISC DAMAGE to WYN:
WEAPON       ROLL  DAMAGE
------------------------------
PPD       A          2+6+2
                    ======
SUBTOTAL             2+6+2
REINFORCEMENT        0+2+0
DAMAGE TO SHIELDS    2+4+2 (4/5/6)

16.6B4 ISC LAB ATTEMPTS
LAB  TARGET  ROLL  RESULT
-------------------------------
1    WD1     1     unidentified
2    WD2     3     Type-I

16.6D2 ISC DAMAGE TO WD1-2:
WEAPON              R DAMAGE
------------------------------
PHASER-3         7  2  4  WD1 destroyed
PHASER-3         8  5  3  WD2 still going

16.6D2 WYN DAMAGE TO IP1:
WEAPON              R DAMAGE
------------------------------
PHASER-3         1  3  4
PHASER-3         2  2  4
PHASER-3         3  6  3
PHASER-3        10  5  3
PHASER-3        11  1  4
------------------------------
SUBTOTAL              18
REDUCTION TO IP1       9 (11 remaining)

17.6A3 IP1 DAMAGE TO WYN:
WEAPON                DAMAGE
------------------------------
PLASMA-G         C    11
------------------------------
SUBTOTAL              11
GENERAL REINFORCEMENT  0
DAMAGE TO SHIELD #1    1
DAMAGE TO SHIELD #2    1
DAMAGE TO SHIELD #3    1
DAMAGE TO SHIELD #4    1
DAMAGE TO SHIELD #5    1
DAMAGE TO SHIELD #6    1
  Plus five odd points to be distributed at WYN's option.  Totals
do not take into account specific reinforcement.

Hosted by www.Geocities.ws

1